Freelancer: bubblea
Chia sẻ:
Báo cáo bài thi

Design of Brick/Stone Entry Sign option4

Cut out details Budget cuts in construction or down. If the car bmw z4 in budget cuts is not fixed any more. hahahaha.

Bài tham dự cuộc thi #47 cho                                                 Design of Brick/Stone Entry Sign
Bài tham dự #47

Bảng thông báo công khai

  • bubblea
    bubblea
    • cách đây 10 năm

    Normally people will look straight into the best perspective. The driver was seen first perspective is important. If the driver was the need to turn to. View is Poor

    • cách đây 10 năm
  • rbacpa
    Chủ cuộc thi
    • cách đây 10 năm

    Especially due to budget issues, the main structure needs to be to the right of the driveway as traffic will be coming only from the left. The left side structure would need to be significantly reduced. I think you are indicating that the extra walls should be planted as opposed to construction.

    • cách đây 10 năm