4 case studies from impacted construction companies (Construction Projects) by COVID-19 with different construction contracts ( AIA, NEC, PWC, FIDIC)
- Tình trạng: Closed
- Giải thưởng: $75
- Các bài thi đã nhận: 3
- Người chiến thắng: priyajen
Tóm tắt cuộc thi
4 case studies from impacted construction companies (Construction Projects) as following :
1 case studies : the contract between contractor and owner is AIA contract.
1 case studies : the contract between contractor and owner is KSA PWC contract.
1 case studies : the contract between contractor and owner is NEC contract.
1 case studies : the contract between contractor and owner is FIDIC contract.
the needed information as bellow :
- brief about the company and the project and its location :
1- How COVID-19 effected projects ?
2- What are the implications of COVID-19 on a project?
3- How project managers acted in response to COVID-19?
4- Did the company check the contracts to know their rights in such a situation?
5- Did the company ask for time extension from the owner ? and what was the owner's response?
6- Did the company ask for additional compensation from the owner ? and what was the owner's response?
7- Did the owner delay the payments because of COVID-19 Impact ?
8- Was the project suspended or terminated? by who? and why?
9- What is the lessons learned from such a situation?
10- What are the recommendations for improving future construction contracts to deal with such a situation?
Các kĩ năng yêu cầu
Phản hồi của người thuê
“Great work exceptional in the quality, quick and informative communication and expertise on the project. Highly recommend ”
Az123600, Saudi Arabia.
Những bài dự thi tốt nhất dự cuộc thi này
-
priyajen India
-
AshiqEnterprise Bangladesh
Bảng thông báo công khai
Làm thế nào để bắt đầu với cuộc thi
-
Đăng cuộc thi của bạn Nhanh chóng và dễ dàng
-
Nhận được vô số Bài dự thi Từ khắp nơi trên thế giới
-
Trao giải cho bài thi xuất sắc nhất Download File - Đơn giản!