Oracle Primavera Experts để thuê

  • Oracle Primavera
  • Online Users
Các gợi ý:
nhiều hơn

Quốc gia

Địa điểm cụ thể

Bài thi

Mức giá theo giờ (USD)

Phân hạng

Trực tuyến

Hiện 4 kết quả
  • Thuê     nadeem887
Thuê     nadeem887

    nadeem887 nadeem887

    Pakistan $12 USD / giờ
    Civil Engr | Revit | Autocad | Takeoff | BOQ
    Pakistan
    0.0
    0 đánh giá 0 đánh giá $12 USD mỗi giờ
    Architectural | Revit | Civil Estimation | BOQ | Civil Engineering | 3D Visualization | Interior/Exterior Design | Product Modeling | SolidWorks | Structural Design | 3D Rendering 👋 Hi, I’m Nadeem, a seasoned Engineer with 9+ years of professional experience in construction, architecture, and engineering design. I’ve...
    Architectural | Revit | Civil Estimation | BOQ | Civil Engineering | 3D Visualization | Interior/Exterior Design | Product Modeling | SolidWorks | Structural Design | 3D Rendering 👋 Hi, I’m Nadeem, a seasoned Engineer with 9+ years of professional experience in construction, architecture, and engineering design. I’ve consistently delivered 5-star projects with a strong focus on accuracy, creativity, and timely delivery. 🔹 Services I Offer: 3D Visualization & Rendering (Interior & Exterior) Architectural & Building Design Interior & Exterior Design Concepts 2D & 3D Layout Drawings Product Design & 3D Modeling Quantity Take-off / BOQ Preparation Construction Planning & Scheduling Shop Drawings & Steel Bar Bending Schedule 🔹 Tools & Expertise: Design & Modeling: AutoCAD, Revit, SketchUp, 3ds Max, SolidWorks Rendering Engines: V-Ray, Corona, Lumion Planning & Estimation: Primavera, MS Project, Bluebeam, PlanSwift, Excel ✨ I take pride in delivering high-quality work at fair prices, ensuring fast turnaround times, unlimited revisions, and results that exceed client expectations. 📩 Let’s connect and discuss how I can add value to your project! Regards, Nadeem ít hơn
  • Thuê nadeem887
  • Thuê     mohamedoussamab6
Thuê     mohamedoussamab6

    mohamedoussamab6 mohamedoussamab6

    Algeria $10 USD / giờ
    Civil Engineer and Project Planner with 6Years EXP
    Algeria
    0.0
    0 đánh giá 0 đánh giá $10 USD mỗi giờ
    From Idea to Execution — I Plan Projects That Work With 6 years of experience in project planning, budgeting, and design roadmaps, I help clients reduce risk, control costs, and move forward with confidence. ✔Project Planning ✔ Project Budget ✔ Budget Management ✔ Design Roadmap ✔ Project Roadmap ✔ Timeline Planning ✔...
    From Idea to Execution — I Plan Projects That Work With 6 years of experience in project planning, budgeting, and design roadmaps, I help clients reduce risk, control costs, and move forward with confidence. ✔Project Planning ✔ Project Budget ✔ Budget Management ✔ Design Roadmap ✔ Project Roadmap ✔ Timeline Planning ✔ Project Execution ✔ Cost Control ít hơn
  • Thuê mohamedoussamab6
  • Thuê     Safi112233
Thuê     Safi112233

    Safi112233 Safi112233

    Pakistan $10 USD / giờ
    Structural Engineer | RCC | Wood | Steel Designer
    Pakistan
    0.0
    0 đánh giá 0 đánh giá $10 USD mỗi giờ
    I am a Civil and Structural Engineer with extensive experience in designing, analyzing, and delivering safe, efficient, and cost-effective structures. My expertise covers a wide range of projects — from residential and commercial buildings to steel, concrete, and timber structures — ensuring compliance with...
    I am a Civil and Structural Engineer with extensive experience in designing, analyzing, and delivering safe, efficient, and cost-effective structures. My expertise covers a wide range of projects — from residential and commercial buildings to steel, concrete, and timber structures — ensuring compliance with international standards such as AISC, ACI, ASCE, Eurocode, and BS. I provide complete engineering solutions including: 1. Structural analysis & design (ETABS, SAP2000, STAAD Pro, SAFE) 2. Detailed CAD drawings and Revit modeling 3. Foundation design and soil-structure interaction 4. Wind, seismic, and load calculations 5. Bill of Quantities (BOQ) and technical documentation 6. Code analysis and compliance reports 7. Retrofit, repair, and strengthening solutions I prioritize accuracy, constructability, and timely delivery for every project. My workflow ensures clear communication, transparent cost estimates, and professional-quality deliverables. Whether you need a full structural design package, a specific calculation, or a review of existing plans, I am committed to turning your concept into a safe and buildable reality. Let’s discuss your project and bring your vision to life with precision engineering. ít hơn
  • Thuê Safi112233
  • Thuê     aliCizvil
Thuê     aliCizvil

    aliCizvil aliCizvil

    Pakistan $10 USD / giờ
    Civil Engineer | AutoCAD & Revit BIM Expert
    Pakistan
    0.0
    0 đánh giá 0 đánh giá $10 USD mỗi giờ
    I am a Civil Engineer specializing in AutoCAD 2D/3D drafting, Revit modeling, and BIM-based digital design. I enjoy turning ideas, sketches, and technical concepts into clear, accurate, and build-ready drawings. My work combines precision, creativity, and a strong understanding of engineering principles. I have...
    I am a Civil Engineer specializing in AutoCAD 2D/3D drafting, Revit modeling, and BIM-based digital design. I enjoy turning ideas, sketches, and technical concepts into clear, accurate, and build-ready drawings. My work combines precision, creativity, and a strong understanding of engineering principles. I have worked on multiple online and remote projects where I delivered architectural and engineering drawings, 3D models, and complete documentation for clients. My experience working with online clients has been smooth and professional, with a strong focus on clear communication, meeting deadlines, and delivering exactly what was agreed. This has helped me understand client requirements better and produce results that are practical and easy to execute. In addition to design and modeling, I also have hands-on knowledge of project planning and project controlling. I work with Primavera P6 and MS Project to develop schedules, track progress, manage resources, and support effective project execution. I can assist you with: -AutoCAD 2D/3D drafting and detailed drawings -Revit modeling, BIM workflows, and modular design -Floor plans, sections, elevations, and 3D views -PDF/hand-sketch to CAD conversion -Engineering documentation and clean project portfolios -Project planning, scheduling, and progress tracking (Primavera P6 & MS Project) I’m committed to quality, clarity, and timely delivery. Whether you need a detailed drawing or a complete BIM model, I aim to provide work that is accurate, professional, and aligned with your project goals ít hơn
  • Thuê aliCizvil

ơi, đây là một số freelancer đang ngoại tuyến

ơi, đây là một số freelancer đang ngoại tuyến liên quan đến ""