Project number critical pathscông việc

Bộ lọc

Tìm kiếm gần đây của tôi
Lọc theo:
Ngân sách
đến
đến
đến
Loại
Nhiều kỹ năng
Ngôn ngữ
    Tình trạng công việc
    38,330 project number critical paths công việc được tìm thấy, giá USD

    I am a Powerseller on eBay and I have my own software to list items. The software stopped working and I need to fix it. I need to be able to see what Mozilla sends to the eBay server when I click on the "Submit" button. Mozilla sends something similar to this: GET /aw-cgi/[đăng nhập để xem URL] HTTP/1.0 Accept: image/gif, image/x-xbitmap, image/jpeg, image/pjpeg, */* Accept-Lang...

    $82 (Avg Bid)
    $82 Giá đặt trung bình
    6 lượt đặt giá

    We would like program written for the windows platform to assist us in performing keyword searches on archived message stores (PST) from Microsoft Outlook. These stores routinely exceed 1Gb (but not 1.5Gb), and we're finding that we're continually having to perform searches across 60-70gb of data, looking for "emails to person x", or "emails from person y", or...

    PHP
    $308 (Avg Bid)
    $308 Giá đặt trung bình
    10 lượt đặt giá
    print preview in web page Đã kết thúc left

    Hello - thank you for responding to my project proposal. The purpose of the project is to allow users access to tif images of multipage documents (they are over 10 pages) that are being stored on my server. The files are large, approximately 10 MB each. I need the users to be able to see the images of all pages such as in a print preview, and print them as well. ## Deliverables The exact functi...

    $2960 (Avg Bid)
    $2960 Giá đặt trung bình
    3 lượt đặt giá

    Hi, I need a win32 wizard for remotely setting up quickly unix/linux webservers. The tool should have wizard-style (ask question, users takes options) and allow making the most important settings (for example set up domain, adding users, password protect directory, creating subdomain etc.). Connection should be over SSH (or maybe you have other suggestions here?). Also it should allow t...

    $343 (Avg Bid)
    $343 Giá đặt trung bình
    3 lượt đặt giá
    MS Access DISASTER Form Đã kết thúc left

    Currenlty, I have a word doucument that captures data for DISASTER VICTIM IDENTIFICATION FORM. I need to transfer this Word Document into an Access Database where I can do the following: (1) Add/Delete/Edit & Report Functionality to New and Old records (2) Needs a "Creative" form built, so the end user can update the information in Time Critical Situtaions (3) Consolidati...

    $111 (Avg Bid)
    $111 Giá đặt trung bình
    6 lượt đặt giá

    Hello everyone, This is Jonathan Regan here :) I've just moved hosting companies, and I'm in the process of moving some of my old files to a new server account. I have done most of the work copying the actual files, but I am unsure how to move over the contents of the MySQL databases to the new server account. So, your task is ... - FTP into my old server, and check out the permissi...

    $15 (Avg Bid)
    $15 Giá đặt trung bình
    1 lượt đặt giá

    Consider the structure for an unlimited-digit number as given in the attached WordPad doc. Turn this into an ADT with the following operations. In the following descriptions number refers to a linked list of digits as defined in the attached WordPad doc, and M, N and O are all numbers. The sample usage for each operation shows how it might be used, although you can make your operations work differ...

    $21 (Avg Bid)
    $21 Giá đặt trung bình
    20 lượt đặt giá
    Help w/Java Program Đã kết thúc left

    Design and Implent an Airline System · Design and implementation using concepts like Polymorphism and Inheritance · Fare Calculation consider at least 10 cities · Store cities and distances in a data structure · Store paths (between cities) in a separate data structure as in the number of miles to cover between the cities · Check for validity of paths between cit...

    $103 (Avg Bid)
    $103 Giá đặt trung bình
    25 lượt đặt giá
    Simple php script Đã kết thúc left

    I regularly have a bunch of php/mysql stuff I need to get done. Right now I have a small test project, and I'd like to use this to test out working with a new developer. If this project goes well, I will have plenty more projects which can be done. SPAM BIDS WILL BE IGNORED! READ AND RESPOND TO THE BELOW IF YOU WANT YOUR BID TO BE CONSIDERED! Requirements for working with me over the longer t...

    $52 (Avg Bid)
    $52 Giá đặt trung bình
    16 lượt đặt giá

    We require a high quality logo for a new website. This "logo" will also be our "mascot", similar to AskJeeves.com. We will use this as a key design element of our new web site. The URL will be [đăng nhập để xem URL] We want a logo/mascot of a sly, cool looking cat standing up (not on all four) - as in "cat in the hat" type look. The website is going to be an electro...

    $100 (Avg Bid)
    $100 Giá đặt trung bình
    1 lượt đặt giá
    296484 Fax software Đã kết thúc left

    We require a simple fax software utility to run under Windows. Choice of programming language is not critical. The software will be used for marketing purposes to send faxes to our existing customers. The faxes will be short in length, generally between 2-5 pages long. The cover page for each recipient will be different, showing the date of their last order, services requested, etc. We have databa...

    $250 (Avg Bid)
    $250 Giá đặt trung bình
    1 lượt đặt giá
    customer database Đã kết thúc left

    I have a suite of compiled programs being developed for small business tools. I will be selling via licenses and resellers. We will be needing a customer database to manage emails, newsletters and customer accounts. The customers access is via an annual license fee - so management of this information is critical. ## Deliverables 1) Complete and fully-functional working program(s) in executable ...

    $230 (Avg Bid)
    $230 Giá đặt trung bình
    24 lượt đặt giá
    DLL Intercept Đã kết thúc left

    I have a DLL (attached) that is part of a free server for a video game (Command & Conquer: Renegade). This DLL is called whenever the game server does a critical game function. I would like someone to write a wrapper DLL that will intercept all calls to the original DLL, log them to a text file (that can be simultaneously and repeatedly read by another program), then pass the DLL request along...

    $64 (Avg Bid)
    $64 Giá đặt trung bình
    5 lượt đặt giá
    Floyd-Warshall - Shortest Paths Đã kết thúc left

    I need a program that will implement the Floyd-Warshall alogrithm to find the shortest paths for a directed graph. It should allow the user to enter the total number of vertices and edges of the graph manually. It should output the final D and pi values for each vertex. It should be implemented with C++. ## Deliverables 1) Complete and fully-functional working program(s) in executable form as w...

    $17 (Avg Bid)
    $17 Giá đặt trung bình
    9 lượt đặt giá
    pdf viewer Đã kết thúc left

    I am trying to get a pdf viewer in visual basic. I want the viewer to view pdf files only. I want to eliminate the save and printing function. Meaning that there will be listboxes with paths to the pdf files they click on the file desired and the pdf file will open inside of my vb6 application and allow them to zoom, change pages, find, but not save or print. ## Deliverables 1) Complete and ful...

    $30 - $5000
    $30 - $5000
    0 lượt đặt giá
    c++ random number generators Đã kết thúc left

    need help using uniform random variables to apply central limit theorem to create normal random variables with zero mean and unity variance. a few quantity of samples should be enough. would like to use 12 and 24 for different problems. Also need help using 50 random variables to generate and arbitrary number of N normal random variables with mean = sqrt(3) and variance = 30. use 10,000 samples. a...

    $19 (Avg Bid)
    $19 Giá đặt trung bình
    2 lượt đặt giá

    Hi, I need a win32 wizard for remotely setting up quickly unix/linux webservers. The tool should have wizard-style (ask question, users takes options) and allow making the most important settings (for example set up domain, adding users, password protect directory, creating subdomain etc.). Connection should be over SSH (or maybe you have other suggestions here?). Also it should allow the user to ...

    $170 (Avg Bid)
    $170 Giá đặt trung bình
    2 lượt đặt giá
    Project in PERL Đã kết thúc left

    Basic System: A UNIX computer system handles printing in the following manner: -3 USER processes submit print jobs of various sizes at random intervals to a VALIDATION QUEUE. -jobs are taken from the validation queue by a single VALIDATOR process which will check for a user entry on a USER STATUS file. -the validator will take ONE of the following actions, according to the presence or absence of a...

    $59 (Avg Bid)
    $59 Giá đặt trung bình
    2 lượt đặt giá

    Create a small program that inputs two points, upper left and lower right, and calculates a unique value that represents the pixel layout on the screen in that area. There needs to be two buttons, "Black" and "All" When "black" is pressed the program should find all the black pixels in the specified area of the screen and calculate a value based on layout of the black...

    $147 (Avg Bid)
    $147 Giá đặt trung bình
    17 lượt đặt giá
    Windows Hook Đã kết thúc left

    I need a program that will hook into windows messaging and give me the name of any files opened from inside another program. For instance MS Word calls many dll files. As it does, I need a a listbox to be populated with the path of the file that it calls. So I would presume that the front end of the program I need would consist of a form with a textbox where the path of the executable program goes...

    $35 (Avg Bid)
    $35 Giá đặt trung bình
    9 lượt đặt giá
    Small information only website Đã kết thúc left

    A small company website of 20 pages or less that mimics in style and layout [đăng nhập để xem URL] but contains no Flash elements. The web-site is not intended to be a primary source of lead generation, rather only a source of information. I anticipate that no business will be captured from the site and as such, search engine rankings are of medium importance. A briefing document is available for ...

    $171 (Avg Bid)
    $171 Giá đặt trung bình
    42 lượt đặt giá

    I would like to get the serial number out of a bios under a win32 environment. It cannot rely on wmi as wmi is not install on the computer. It should directly talk to the bios to get this info ## Deliverables 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Installation package that will install the software (in ready-to...

    $36 (Avg Bid)
    $36 Giá đặt trung bình
    11 lượt đặt giá

    (1) I am posting this for a client of mine who needs a password protect directoy with a username/password. Must me able to assign user/pass of his choosing to this directoy. (2)Order form working on front end of site, but there is an array problem which needs to be fixed, and this same orderform will also be used in the protected directory. Once the front orderform is fixed, then this same order...

    N/A
    N/A
    0 lượt đặt giá
    296056 number guess mod Đã kết thúc left

    I need a simple mod done to a number guessing script. When a user guesses the right number and wins i need a unique ticket number to be generated and sent to me via email. I also need a simple form for the winner to fill out with the ticket number embedded. To check the script out it can be found here: [đăng nhập để xem URL] (number guess version 1.0)

    N/A
    N/A
    0 lượt đặt giá

    Backup Program simple, simple, simple, Copy to many destinations, floppy, cd, folder on local drive, network drive, etc. Easy to put an automated label on the backup file/folder Backup file or folder name should have the date embedded so we can have up to two weeks of copies i.e. monday backup file is mon0601803abc, where mon is the day of the week, 061803 is the date, (maybe time too) and the las...

    $69 (Avg Bid)
    $69 Giá đặt trung bình
    9 lượt đặt giá

    Hello there. This is a relatively simple project. I have 2 scripts that ask users to signup. (They are image rating scripts). Both are completely different. basically, I need PayPal and [đăng nhập để xem URL] integration in both and the option in each admin panel to turn on or off one or both. Simple as that. Now, to stress... I am not an idiot, I need FULL integration. Not just buttons added. ...

    N/A
    N/A
    0 lượt đặt giá

    This concept is somewhat unique (at least I hope) in that it to some extent combines the functions of a Blogging or Content Management System (such as Drupal or MovableType) and a traditional Bulletin Board system (such as phpBB or UBB). It will probably require a hack of either phpBB, Drupal, or both. Or it may require a combo system such as pMachine (which I believe includes a BB system off-the-...

    $767 (Avg Bid)
    $767 Giá đặt trung bình
    2 lượt đặt giá

    Commission-only based work - 33% of every sale! Earn £49.50 on the lowest priced product. The very generous commission rate is to compensate for no up front payments. You will be required to work much in the same way as a franchisee, but with no set-up costs. It is up to you to market, sell and finalise the sale. Online sales tools to back you up are being prepared as we speak. There are s...

    $200 - $300
    Niêm phong
    $200 - $300
    0 lượt đặt giá

    For this program a class and a client must be made. The purpose of the second project is to demonstrate the use of friends and the use of a random number generator. You are to ask the user for the number of elements in a list (maximum 10). The random number generator will generate the number desired. The numbers will range from 1 to 7(also generated by a random number generator). Generate a second...

    $6 (Avg Bid)
    $6 Giá đặt trung bình
    4 lượt đặt giá

    Hi, I need someone to do a simple maze game for me in visual basic. Which all i want for it,is for the game to have a background and the user goes throughthe background which has paths like a maze and then when they get to the end of the maze it will say you win... also for there to be a menu control that says start the reset (for making a new game) and then exit and where it says solve (which ...

    $25 (Avg Bid)
    $25 Giá đặt trung bình
    1 lượt đặt giá
    Graphic design Đã kết thúc left

    Im having a site built by a RAC coder. I need some graphic designs to be made. Here is a description of the site. The site is a rate a pic type site. It is geared for girls. The only pictures the users can upload are digital pics. Since the site is for younger users images of women who do not fit the profile cant be used. The images should be fun, crazy, sexy, cool and if at all possible digital. ...

    $20 (Avg Bid)
    $20 Giá đặt trung bình
    4 lượt đặt giá
    Bulk Emailing application Đã kết thúc left

    I need a ready to use bulk emailing application. It must be written on C/C++ (at least its critical code). The application must use Socks/Https proxy servers as relays and must send emails directly to the domain's MX. I don't need an application wich sends thru open relays or something else. Software must have a web face, from which it is easy to handle the process of mailing. Of course...

    $200 - $300
    Niêm phong
    $200 - $300
    0 lượt đặt giá

    I need a program that will help me deliver my information to my customers. One submission of a string of text by the operator would be sent to the users using this program, and the information will be simulcast on our website. This program should be user friendly. We need a program that will run in windows that will allow us to give real time news to our customers. It must be able to access our In...

    $274 (Avg Bid)
    $274 Giá đặt trung bình
    14 lượt đặt giá
    PHP/mySQL regex stuff... Đã kết thúc left

    Hi all, I've just put up a PHP/mySQL singles site script (which I wasn't talented enough to write) at [đăng nhập để xem URL] . I've tweaked it a bit and it is a pretty good little script but as I want to change this into a pay site once I reach 'critical mass', I need to prevent users from writing contact information in their profiles or in the messages that they send to e...

    $194 (Avg Bid)
    $194 Giá đặt trung bình
    18 lượt đặt giá

    Name: Experimental utility program with a sequential number generator for Mac OS X. We have an idea to create a simple software for Mac OS X with a control panel to alter the sequence of numbers. It will require an automatic installer/de-installer, (which could be a commercially available program). It will also need a 15-day trial component, (this could also be a commercially available 15-day tria...

    PHP
    $900 (Avg Bid)
    $900 Giá đặt trung bình
    3 lượt đặt giá

    Name: Experimental utility program with a sequential number generator for Windows XP. We have an idea to create a simple software for Windows XP, with a control panel to alter the sequence of numbers. It will require an automatic installer/de-installer, (which could be a commercially available program). It will also need a 15-day trial component, (this could also be a commercially available 15-day...

    PHP
    $484 (Avg Bid)
    $484 Giá đặt trung bình
    4 lượt đặt giá
    WPP Control Panel Script Đã kết thúc left

    We are an Ecommerce hosting provider that hosts many brick-and-mortar companies. We a need multiple server Control Panel. Http://[đăng nhập để xem URL] For stats, we use Webilizer For email systems we use Communigate Pro We do not have site tools, We do have a few form scripts, and such we could intetgrate and offer. We wish them to have the folllowing elements that we can offer, which is outlined...

    $425 (Avg Bid)
    $425 Giá đặt trung bình
    8 lượt đặt giá

    Easy Project :: Involves Adapting a Messageboard Script (which has already been written) that was written for UNIX based systems. I need the program to adapt the code so that the code will be WORK on Windows98, ActivePerl 5.6.1.629 (basically PERL), Apache 1.3.23 website where the scripts were downloaded from::: Matt's Script Archive [đăng nhập để xem URL] I have also uploaded the scripts a...

    $20 (Avg Bid)
    $20 Giá đặt trung bình
    1 lượt đặt giá
    Java Search Program Đã kết thúc left

    In this project, the task is to transform a string like "ART- - -" into some goal string like "- - -TAR". The "-" denotes an open position and MUST use heustic search, specifically the A* algorithm. The only operational constraints for moving characters are: A. Only one character may be moved at a time. B. Characters may be pushed into an adjacent open space immediate...

    $59 (Avg Bid)
    $59 Giá đặt trung bình
    2 lượt đặt giá
    Maze Đã kết thúc left

    An ANSI C program that accepts one command line argument. This argument will be the name of a file containing a maze. The maze file is a text file made up of spaces and #'s plus one `s' and one `f', representing the start and finish of the maze. For the maze to be well formed it must: 1. The start and end must be surrounded by an unbroken perimeter of #'s 2. After the final # i...

    $36 (Avg Bid)
    $36 Giá đặt trung bình
    7 lượt đặt giá

    I could not put it in the dates. But if it can be completed by Monday May 19th 2003 by 5pm I will try to inlcude a bonus of 5 dollars. I know its not much bus this program is not that bad or hard either. Using the project management system tree depicted above as a base class with three derived classes (i.e., activity, product configuration, and resource management), develop the definitions for the...

    $15 - $20
    $15 - $20
    0 lượt đặt giá

    I need a simple yet complete CGI Installation Tutorial Document. Topic to Include: Editing Script In a Text Editor ([đăng nhập để xem URL]) Modifying Perl Location Modifying Variables in a script Finding paths (file system and web) finding sendmail Uploading Files FTP Programs Change Permissions Accessing a Script Via Form or Link MySql Access Troubleshooting CGI Scripts 500, 403 errors etc pr...

    $25 (Avg Bid)
    $25 Giá đặt trung bình
    1 lượt đặt giá
    Simple Prog! Number game Đã kết thúc left

    I'm REALLY stuck with this code, please help! I'm new to C++ and i'm trying to work on this task, but i'm lost. - The user is asked to think of a number between 1-100. The program makes a guess at the number and asks if this is the nubmer the users thought of. If the computer's guess is wrong, then it asks the user whether the number is higher than the number it guessed. T...

    $14 (Avg Bid)
    $14 Giá đặt trung bình
    32 lượt đặt giá
    Graphics / Icons needed Đã kết thúc left

    I am looking to have done couple graphics, very similar as ones at [đăng nhập để xem URL] (desktops, notebooks, etc) but with icons: sailing, scuba diving, fishing, windsurfing, jetski, sea scouts, shanties, news, calendar, photo album, forum, about us, aplication, members, mail, constitution, . They should be done as vector files (.ai). When you bid - please provide link to your jobs or send at...

    $94 (Avg Bid)
    $94 Giá đặt trung bình
    13 lượt đặt giá
    76768 Move HTML/CGI/PHP Site Đã kết thúc left

    I recently switched hosts for one of my sites. I need someone to take the site off the current server and move it over. There are a few php/cgi scripts that will need to have the variables adjusted to meet the new paths, etc. I will forward payment once I see everything is up and running as normal. I need this completed today, ASAP. I will select someone with high feedback, as this is importa...

    $35 (Avg Bid)
    $35 Giá đặt trung bình
    1 lượt đặt giá
    Internet Cleaning Tool Đã kết thúc left

    Requirements Clean all temporary internet files in IE 6.0+ and Netscape 6.0+: Cache Cookies (would also like the ability to save cookies) History Mail trash Drop-down address bar Auto-complete forms Downloaded program files Recycle bin Registry streams Windows run and find history Scan disk files Recently viewed pictures [đăng nhập để xem URL] files Recently opened documents Windows temp files fol...

    $460 (Avg Bid)
    $460 Giá đặt trung bình
    33 lượt đặt giá
    Guess the number game Đã kết thúc left

    I need a number game creating in C++, where the computer can guess a number you are thinking of between 1-100. The game needs to have a 'do you want to play again?' function, and be able to tell the player how many guesses it has taken the computer to guess. Needs to be VERY basic, as I plan to use it for research, and a complete beginner! :) ## Deliverables 1) Complete and fully-func...

    $13 (Avg Bid)
    $13 Giá đặt trung bình
    25 lượt đặt giá
    Guess the number game! Đã kết thúc left

    I need a number game creating where the computer can guess a number you are thinking of between 1-100. The game needs to have a 'do you want to play again?' function, and be able to tell the player how many guesses it has taken the computer to guess. ## Deliverables 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done....

    $11 (Avg Bid)
    $11 Giá đặt trung bình
    42 lượt đặt giá

    Seeking a two function program. Function 1. Parse, create seperate records, dedup within companies a. Parse multiple names and titles out of individual fields in range of user selected columns (see AD through BK of attached). b. Break down the contact records in a spreadsheet so each contact has it's own row in the spreadsheet or CSV file. c. Break up names into seperate first name, last name...

    PHP
    $157 (Avg Bid)
    $157 Giá đặt trung bình
    12 lượt đặt giá
    need a search page Đã kết thúc left

    I need a search page written in ASP that will display a link to page that matches the searched words or phrase. ## Deliverables 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Installation package that will install the software (in ready-to-run condition) on the platform(s) specified in this bid request. 3) Complete own...

    $85 (Avg Bid)
    $85 Giá đặt trung bình
    4 lượt đặt giá