
Closed
Posted
Paid on delivery
I am building a focused construction project-management web app whose top priority is accurate planning and scheduling. The core workflow will let me create projects, break them into tasks, and set clear task-to-task dependencies so the entire timeline adjusts automatically when something moves. Beyond the scheduling engine, I also need a lightweight equipment-tracking module. It should let me assign cranes, loaders, generators, or any other site equipment to individual tasks, flag date conflicts, and produce a daily allocation report. No labour or material tracking is required at this stage, so the interface can stay streamlined around equipment only. Key expectations • Task-dependency scheduler that supports critical-path logic and instantly recalculates dates. • Visual timelines (Gantt or calendar views are welcome as long as dependencies drive them). • Equipment database with availability status, conflict alerts, and simple usage analytics. • Clean, responsive UI built with a modern stack (React + Node or a comparable framework). • REST or GraphQL API so future mobile apps can tap the same data. Acceptance criteria 1. I can build a project, add tasks, link their dependencies, and watch the schedule update in real time. 2. Attempting to double-book a piece of equipment prompts an immediate warning. 3. A single click exports the full schedule (tasks + assigned equipment) to PDF or Excel. 4. Unit and basic integration tests cover critical logic. If you have an existing scheduling engine that already handles task dependencies, let me know; we can integrate rather than reinvent. Otherwise, propose the tech stack and timeline you think works best and we can get this rolling.
Project ID: 40644897
96 proposals
Remote project
Active 2 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
96 freelancers are bidding on average ₹29,188 INR for this job

Good Day! I have carefully analyzed your project and can build a responsive construction scheduling platform with dependency-driven critical-path logic, real-time timeline recalculation, Gantt/calendar views, and a streamlined equipment allocation module with conflict alerts and reporting. I’ll use a modern React/Node stack with a scalable REST API, robust database design, exports, and unit/integration tests covering the critical scheduling logic. I am eager to contribute my expertise and deliver top-notch results for your project. Let's discuss the project further in chat or let's have a quick call! Regards Muhammad A...
₹25,000 INR in 7 days
8.1
8.1

Hi, thank you for posting your project! I have 7+ years of experience building custom project-management and business applications. I can develop a responsive scheduling system with task dependencies, critical-path logic, Gantt/calendar views, equipment allocation, conflict alerts, PDF/Excel exports, and REST APIs. I’ll focus on a clean architecture so the scheduling engine remains reliable and can later support mobile apps. I can also provide testing for the core scheduling and equipment logic. I’d be happy to discuss the workflow, recommended stack, timeline, and milestones.
₹35,000 INR in 7 days
6.4
6.4

Your critical-path scheduler will fail under real-world conditions if the dependency engine doesn't account for lag types (finish-to-start, start-to-start) and resource leveling when equipment conflicts cascade across multiple tasks. This creates phantom float that makes your timeline look feasible on paper but impossible to execute on-site. Quick questions - are you planning to handle partial equipment availability (e.g., crane available 4 hours per day), or is this strictly full-day allocation? And what's your expected project scale - 50 tasks or 500? Here is the architectural approach: - CRITICAL-PATH LOGIC: Build a directed acyclic graph solver in Python that recalculates float and earliest/latest dates in under 200ms for 500-task projects, exposing results via REST endpoints. - EQUIPMENT CONFLICT DETECTION: Implement a time-slot reservation system in MySQL with indexed date ranges and trigger-based validation that blocks double-bookings at the database layer before they reach the UI. - REAL-TIME UPDATES: Use WebSocket connections through Node.js to push schedule recalculations to all active clients instantly when dependencies shift, eliminating stale Gantt views. I've built two similar scheduling systems for commercial construction firms that managed 200+ concurrent projects. Let's schedule a 20-minute technical call to walk through your dependency rules and equipment allocation logic before we lock the architecture.
₹22,500 INR in 7 days
7.3
7.3

I can develop a task-dependency scheduler that recalculates dates in real-time, ensuring your construction project management app meets its core requirements. First, I'll outline the tech stack, likely using React and Node, and confirm the specific features you want for the equipment-tracking module. Based in Toronto, I work efficiently and am always available for updates and discussions. Let's get started.
₹12,500 INR in 3 days
6.6
6.6

As an experienced Full Stack Developer and AI Solutions Expert, I have a sound technical understanding and prowess to deliver high-quality web apps, which makes your Construction Scheduling Platform Development a perfect match for my expertise. Throughout my 8+ years in the industry, I've successfully delivered over 200 projects, using modern tech stacks (including React and Node.js) that enhance user experience and drive business growth precisely what your project needs. In terms of your acceptance criteria, my robust command over HTML, JavaScript and API Development will ensure; 1. Real-time project task scheduling with instantaneous adjustments on dependencies update. 2. Robust validation checks to prevent equipment double-booking. 3. One-click PDF/Excel export capability for seamless data sharing. 4. Integration of comprehensive unit and integration tests to ensure dependable functionality.
₹27,500 INR in 7 days
6.4
6.4

Hello there, This is a great fit for my experience with React/Node and building workflow-driven applications. I can develop the dependency-based scheduling engine with critical-path recalculation, Gantt/calendar views, and a streamlined equipment tracking module with conflict detection and daily allocation reports. I’ll also include REST/GraphQL APIs, PDF/Excel exports, and unit/integration tests for the core scheduling logic. If you already have a scheduling engine, I’m happy to evaluate and integrate it instead of rebuilding from scratch. I can suggest the right architecture and deliver this in clear, testable phases. Let's chat, Himanshu
₹25,000 INR in 7 days
6.2
6.2

I have read your job post, I am confident I can construct the perfect scheduling platform for your construction project needs. My extensive proficiency with React, Node, and RESTful or GraphQL APIs aligns seamlessly with your vision for a modern stack and data accessibility across platforms. Your specific requirements of a task-dependency scheduler aligned with critical path logic, visual timelines driven by dependencies, equipment database management with conflict alerts, as well as easy data export features are all tasks within my capability. I've successfully built similar platforms that integrate multiple elements like you've described to ensure smooth operations. A recent example is the inventory management platform I developed where availability status, conflict alerts, and comprehensive usage analytics were essential factors.
₹25,000 INR in 15 days
6.1
6.1

Hi Sir, I read that you need a task-dependency scheduling engine with critical-path logic that auto-recalculates the timeline when anything shifts, paired with a lightweight equipment-tracking module assigning cranes, loaders, and generators to tasks, flagging date conflicts, and generating daily allocation reports. I have 8+ years of real-time IT experience in full-stack development, comfortable building dependency-driven scheduling logic and conflict-detection systems across business and workflow platforms. I understand the core challenge here: when one task shifts, every dependent task and its equipment assignment needs to recalculate correctly without creating silent conflicts. My approach: a task/dependency graph model driving both the Gantt/calendar view and critical-path calculation, a separate equipment allocation layer that checks for date overlaps in real time and throws an immediate warning on double-booking, and a clean REST API so a future mobile app can consume the same data. I'll build with React on the frontend and a modern backend (Node or .NET Core,happy to align on your preference), cover the critical scheduling and conflict logic with unit/integration tests, and add one-click PDF/Excel export for the full schedule. I don't have a pre-built scheduling engine to plug in, so I'd build this from your exact requirements rather than force-fit an existing one. Let's connect, ready to start right away. Akshay B
₹15,000 INR in 7 days
5.7
5.7

Hi, Senior Full-Stack Architect: With 15+ years of experience, I specialize in building robust project management solutions. I will develop a construction scheduling platform that ensures precise planning and seamless task dependencies. Execution Strategy: - Implement a dynamic task-dependency scheduler utilizing critical-path logic for automatic date adjustments. - Develop a lightweight equipment-tracking module with conflict alerts and daily allocation reports. - Use React for a responsive UI and Node for backend services, ensuring a modern tech stack. - Design a REST or GraphQL API for future mobile app integration. Key Deliverables: - A fully functional project and task management interface. - Visual timelines (Gantt or calendar views) driven by task dependencies. - An equipment database with real-time availability and usage analytics. - Export functionality for schedules to PDF or Excel. - Comprehensive unit and integration tests for critical logic. Quality & Performance: - Ensure a clean and intuitive user interface for optimal user experience. - Focus on performance and scalability to accommodate future growth. - Maintain data integrity through rigorous testing and validation. Timeline & Next Steps: - Initial prototype in 4-6 weeks, with ongoing support for adjustments. - Documentation throughout the development process for transparency and ease of handoff. Best Regards, Karthik B Resonite Tech
₹50,000 INR in 7 days
5.8
5.8

Expert Developer for Construction Project Management I can build your focused construction project-management platform around the scheduling engine first, with equipment tracking integrated directly into task planning. The goal will be accurate dependency-driven scheduling without adding unnecessary labour or material modules. Project Summary The system will allow project managers to create tasks, define dependencies, automatically recalculate schedules, visualise timelines, and assign site equipment while detecting conflicts in real time. Key Features * Project and task management * Dependency-driven scheduling * Critical-path calculation * Automatic schedule recalculation * Gantt/calendar timeline views * Equipment database and availability * Equipment-to-task assignment * Real-time double-booking alerts * Daily equipment allocation reports * REST/GraphQL API for future mobile apps * PDF/Excel schedule export * Responsive modern interface * Unit and integration testing * Clean source code and documentation I can also evaluate whether an existing scheduling engine is suitable for the dependency and critical-path requirements before implementing unnecessary functionality. Looking forward to hearing from you. Thanks, Viral
₹20,000 INR in 7 days
5.4
5.4

Hello, With 15+ years of experience in web development, I specialize in complex web applications, project-management systems, responsive UI/UX, APIs, database architecture, and real-time workflows. I can build a reliable scheduling platform with dependency logic and equipment management. I’ll share relevant application work in one-to-one live chat. I’ll deliver project/task management, dependency-based scheduling with critical-path recalculation, Gantt/calendar views, equipment allocation, availability and conflict alerts, daily reports, PDF/Excel exports, REST/GraphQL APIs, and responsive UI. I’ll also include unit and integration testing for critical scheduling and equipment logic. Let’s connect in one-to-one live chat to discuss your scheduling rules, existing engine options, preferred approach, timeline, and budget. I’ll share relevant work and outline the development milestones. Regards, Abhijeet
₹20,000 INR in 7 days
6.7
6.7

Hi there, Hope you are doing well I’d love to develop your Construction Scheduling & Equipment Management Platform with a strong focus on dependency-driven scheduling, critical-path planning, and simple equipment allocation. Key Features Project creation and management Task creation with start/end dates and durations Task-to-task dependency management Automatic schedule recalculation Critical Path Method (CPM) Gantt chart and calendar views Real-time timeline updates Equipment database and availability tracking Assign equipment to specific tasks Automatic double-booking/conflict detection Equipment usage and allocation analytics Daily equipment allocation reports PDF & Excel schedule exports Responsive web interface Role-based access and secure authentication REST/GraphQL API for future mobile applications Recommended Tech Stack Frontend: React.js + TypeScript Backend: Node.js + NestJS Database: PostgreSQL Thanks & Regards Dheeraj K.
₹100,000 INR in 7 days
6.2
6.2

Hi! I’m Tarang — with 18+ years of experience and 1,000+ web/mobile solutions, I have strong expertise in complex project-management systems, scheduling logic, React, Node.js and API-driven applications. I can build your dependency-driven scheduling engine with critical-path recalculation, Gantt/calendar views, real-time equipment conflict detection, allocation reports and PDF/Excel exports. I’ll ensure the architecture is scalable for future mobile apps, with clean REST APIs, automated tests and production-ready code rather than overcomplicating the current scope. I’m ready to start immediately and can deliver high-quality work within your timeline. Please join the chat so we can discuss the scheduling approach and get started.
₹12,600 INR in 7 days
4.0
4.0

The first execution step involves designing the core data model for the construction scheduling platform, focusing on the task-to-task dependencies which form the core of the scheduling engine. I propose using a React and Node stack to ensure a modern and responsive platform capable of handling complex construction scheduling logic. The development sequence will focus first on implementing the task dependency scheduler with critical-path logic, followed by integrating the equipment tracking module to manage crane and loader availability. The final deliverable will be a functional platform with real-time schedule recalculations and conflict alerts, which will be checked via the acceptance criteria outlined. I will ensure the API structure supports future mobile application integration. To proceed effectively, are there any existing scheduling engine concepts you prefer to integrate rather than building the dependency logic from scratch?
₹25,000 INR in 7 days
4.1
4.1

With a rich tapestry of skills acquired over 8+ years in mobile app development, software testing and Python programming, I believe I’m the best fit for your construction scheduling platform development project. Your project description deeply resonates with my areas of expertise, especially in backend service development and database optimization for a robust project-management web app. Notably, my proficiency in React and Node.js can be capitalized on to build you an intuitive web interface with the performance that meets your expectations. Whether it's designing visual timelines like Gantt or calendar views driven by task-dependencies or creating real-time updates through our modern REST or GraphQL API, I’m experienced and dedicated to meeting your needs. Moreover, thanks to my strong background on equipment tracking modules, I can deliver a lightweight module that not only flags date conflicts but also supports an immediate warning on double-booking site equipment. Importantly too, I value clean code writing riddled with few errors guaranteeing that your schedule-exporting to PDF or Excel goals will be met successfully. Considering the scale of your project, my database expertise in MySQL, PostgreSQL and MongoDB will ensure your data management and analytics needs are fully satisfied. Let’s revolutionize construction project-management together! Please don't hesitate to contact me to further discuss how we can get this rolling without wasting any time!
₹25,000 INR in 7 days
4.9
4.9

Hi Having worked for over a decade in responsive UI development, Python and Java-driven backends and an expert grip on JavaScript for project tasks and responsibilities, I am your ideal candidate to accomplish your construction scheduling platform. Over the years, I have gained substantial experience designing platforms that align complex inputs with robust outputs, just like what your project demands regarding task dependency, timeline creation, and equipment tracking. So let's not waste time reinventing wheels; instead, let's create new milestones together! CRM, ERP, SAAS & Software Projects CRM for CA Firm- https://www.freelancer.com/portfolio-items/11009761-crm-platform-for-ca-and-accounting Hotel booking platform https://www.freelancer.com/portfolio-items/11005202-b2b-hotel-booking-platform-travel Inventory Management https://www.freelancer.com/portfolio-items/11005229-crm-order-and-inventory-management Regards Parul Saini
₹15,000 INR in 7 days
3.9
3.9

Hello, I reviewed your requirements and can build a focused construction project-management web app with dependency-based scheduling, automatic timeline updates, critical-path logic, and equipment conflict detection. We’ll create a clean, responsive React + Node.js solution with Gantt/calendar views, equipment allocation, PDF/Excel reporting, APIs for future mobile apps, and proper testing of the core scheduling logic. Our team can handle the complete development from UI/UX and backend to testing and deployment. We can also evaluate existing scheduling engines to speed up development and ensure reliable dependency handling. We’re available to start immediately and would be happy to discuss the workflow.
₹20,000 INR in 7 days
4.0
4.0

Hi, I can build this construction project-management app with the scheduling engine and equipment tracking as the core focus. I have experience with React, Node.js, MongoDB, REST APIs, and building responsive web applications with clean, scalable architecture. For the scheduling module, I’ll implement: • Projects → tasks → task dependencies • Automatic date recalculation when predecessor tasks change • Critical-path/dependency logic • Interactive Gantt/calendar timeline • Real-time schedule updates For equipment management: • Equipment database and availability status • Assign equipment to specific tasks • Automatic double-booking/conflict detection • Daily equipment allocation reports • Basic usage analytics I’ll also provide a REST API designed for future mobile applications, along with PDF/Excel schedule exports and unit/integration tests covering the critical scheduling and conflict-detection logic. I would recommend React + Node.js/Express + MongoDB for the stack. For the scheduling engine, I can either integrate a reliable existing dependency/scheduling library where appropriate or implement the required logic specifically for your workflow. I can start with the scheduling foundation first, then build equipment tracking and reporting around it, keeping the architecture scalable for future features. I’m ready to discuss your dependency rules and project workflow and get started.
₹23,000 INR in 7 days
3.8
3.8

Hi, I can build your construction scheduling web app with project/task planning, dependency-based scheduling, critical-path recalculation, Gantt/calendar views, equipment allocation, conflict alerts, and exportable reports. The best solution is to first define the task model, dependency types, project calendar rules, equipment categories, availability logic, and export format. Then I’ll build a clean React + Node/FastAPI-style platform with REST APIs, database schema, scheduling engine, real-time date recalculation, equipment assignment checks, and responsive dashboard. I’m comfortable with project management systems, task dependency logic, critical-path scheduling, Gantt/calendar views, equipment tracking, REST APIs, MySQL/PostgreSQL, React, Node.js/Python, PDF/Excel export, conflict validation, and unit/integration testing. Deliverables will include: * Project and task management * Dependency-based scheduler * Critical-path logic * Auto date recalculation * Gantt or calendar timeline * Equipment database * Availability and conflict alerts * Daily allocation report * PDF/Excel export * REST API backend * Responsive UI * Unit and integration tests * Setup documentation I’ll focus on a focused, reliable MVP where schedule changes update correctly, equipment double-booking is prevented, and the system stays ready for future mobile/API expansion. Best regards Ankit
₹12,500 INR in 2 days
3.8
3.8

Your project requires more than a standard CRUD application because the core challenge is the scheduling engine itself: dependency resolution, critical-path recalculation, and equipment conflict validation need to stay consistent in real time as tasks change. I would approach this as a modular web platform with a React frontend and a Spring Boot or Node.js backend exposing REST APIs for future mobile integrations. The scheduling layer would model task dependencies as a directed graph, allowing automatic recalculation of downstream dates and critical-path detection whenever a task is updated. For the equipment module, the backend would validate allocation windows before confirming assignments, immediately flagging double bookings and exposing availability status through the API. The reporting layer can generate PDF and Excel exports containing both task schedules and assigned equipment. Suggested stack: - React + TypeScript for the UI - Spring Boot or Node.js for the API layer - PostgreSQL for transactional scheduling and equipment data - Automated unit/integration tests covering dependency recalculation and conflict detection To keep the first version efficient and within budget, I recommend starting with: 1. Project/task scheduling engine 2. Dependency visualization (Gantt view) 3. Equipment allocation/conflict alerts 4. Export functionality 5. Core automated tests This structure also leaves room for future additions such as labor tracking, mobile apps, notifications, or advanced analytics without requiring a rewrite.
₹37,500 INR in 21 days
3.8
3.8

Kolkata, India
Member since May 20, 2025
₹1500-12500 INR
$250-750 USD
$3000-5000 USD
$15-25 USD / hour
₹750-1250 INR / hour
$30-250 USD
$11-14 CAD
₹600-1500 INR
₹75000-150000 INR
$30-250 USD
$15-25 USD / hour
₹1500-12500 INR
$750-1500 AUD
₹400-750 INR / hour
£1000-100000 GBP
$250-750 USD
₹600-1500 INR
₹1500-12500 INR
₹12500-37500 INR
₹12500-37500 INR