I bèd a Scope Work, BOM and manhour estimate for each activity as follows: The scope of work to include the following: 1. 2 complete bathroom installations- tiles shower area only with sink and touket bowl 2. Kitchen installation - 14 cabinets 12x24x34 3. Electrical panel only installation no wiring needed 4. AC unit installation 5. Window installation 6qty 24x36 2qty 24x24 6. Interior doors installation 9 qty and 3qty closet double doors 7. Outside doors - 2 qty 8. Door framing installation - around 8qty door
Project ID: 40668480
2 proposals
Active 1 min ago
Location: Pine Hills, United States
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
2 freelancers are bidding on average $170 USD for this job

Hello, Primary risk is scope ambiguity around finishes and site conditions that affect manhour estimates, especially for window openings, door framing and AC unit placement. Unforeseen structural repairs or non-standard door jams will inflate labor and materials quickly; I will flag assumptions up front and estimate contingencies per activity. I have planned and estimated residential remodels for owners and small contractors, producing Scope Work, BOM and manhour estimates that owners used to award bids and track budget performance. My comparable work covered bathroom installs, kitchen cabinet layouts, panel exchanges, HVAC set installs, window and door installs and door framing. I will map each item to labor crews, material list, unit counts and realistic productive hours. I will start by confirming site assumptions and deliverables for each line item: 2 complete bathroom installations- tiles shower area only with sink and touket bowl; Kitchen installation - 14 cabinets 12x24x34; Electrical panel only installation no wiring needed; AC unit installation; Window installation 6qty 24x36 2qty 24x24; Interior doors installation 9 qty and 3qty closet double doors; Outside doors - 2 qty; Door framing installation - around 8qty door. That leads to a concise Scope Work, an itemized BOM with quantities and unit costs, and manhour estimate per activity with contingency notes. Approach: I will perform a short checklist-driven site confirmation (photos and measurements) then produce a one-page scope summary and an itemized estimate in spreadsheet format. Estimates will include crew type, manhours, and assumptions for materials and waste. - Do you have recent photos and measurements for all rooms and existing panel/AC locations? - Are there any known structural modifications, permits, or HOA rules I should include in the estimate? Looking forward to hearing from you, Affan Qureshi
$200 USD in 2 days
0.0
0.0

orlando, United States
Payment method verified
Member since Sep 5, 2014
$3000-5000 USD
$250-750 USD
$30-250 USD
$1500-3000 USD
$30-250 USD
₹600-1500 INR
$30-250 USD
$250-750 USD
$250-750 USD
₹100-400 INR / hour
₹1500-12500 INR
₹17000 INR
$250-750 AUD
₹1500-12500 INR
$250-750 USD
₹100-400 INR / hour
min $50 USD / hour
₹12500-37500 INR
₹1500-12500 INR
₹12500-37500 INR
₹750-1250 INR / hour
₹100-400 INR / hour
$15-25 USD / hour
₹600-1500 INR
$30-250 USD