
Closed
Posted
Paid on delivery
a portfolio of solar, wind and hybrid assets across nine states in India and at international rooftop locations. Every month the team prepares a management information report that compares the generation and revenue actually achieved against the Annual Operating Plan, which is the approved budget for the financial year. This report is circulated to senior management and forms the basis of the monthly performance review. At present the report is prepared manually in Excel. The Annual Operating Plan is held in one workbook containing the approved budget for every project and special purpose vehicle, with a month wise breakdown of generation, tariff and revenue across the financial year. Actual figures and asset master details are received separately, and the reporting workbook is assembled each month by copying values between files and linking cells by hand. Clean Max has asked atQor to automate the preparation of this report so that the monthly output is produced consistently, is easier to verify and is presentable to management without rework. The first module covers the Annual Operating Plan, which is the budget baseline against which all actual performance is measured. Current Challenges • The monthly report is assembled manually by copying values between Excel files and linking cells, which is time consuming and difficult to verify. • Monthly budget values are retrieved through manual cell links, and a single broken or incorrect link changes the reported figures without being noticed. • The Annual Operating Plan workbook holds seven repeating month wise blocks with duplicated column headings, which makes the file difficult to read and to work with reliably. • Project and special purpose vehicle names are recorded inconsistently across files, including differences in spelling, legal suffix, letter case and trailing spaces, which prevents values from being matched reliably between files. • Certain rows carry no special purpose vehicle value or a placeholder value, so those rows cannot be attributed to an entity in any consolidated view. • The reporting workbook contains around one hundred and ten columns with three stacked heading rows, which cannot be read on screen without extensive horizontal scrolling. • Sub total rows are interleaved with data rows in the reporting workbook and are not identified by any flag, which makes the file difficult to process consistently. • The preparation of the report depends on individual knowledge of how the workbook was built, and is difficult to hand over. • There is no single controlled location where the approved budget for the financial year is held and referenced by all stakeholders. At the Heart of Your Digital Journey Proposed State Current Challenge Proposed State Monthly report assembled by copying values and linking cells manually. The report is produced by the system from an uploaded Excel file, without manual copying or cell linking. Monthly budget values retrieved through manual cell links that can break. The budget is uploaded once for the financial year and held centrally, so every view refers to the same figures. Annual Operating Plan workbook difficult to read due to repeating blocks and duplicated headings. The system reads the file as it is and presents the values in a structured, readable form. The client is not required to change the source file. Project and entity names recorded inconsistently across files. An SPV Code carried in the Excel template is used for matching, and any inconsistency is reported for correction
Project ID: 40790612
19 proposals
Remote project
Active 2 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
19 freelancers are bidding on average ₹2,003,022 INR for this job

Unflagged subtotal rows silently double-count a budget; every upload reconciles to the workbook's own totals before any figure is published. Working AOP upload with a validation report of rejected rows and unmatched SPV codes by day 5 for you to test; full module with central budget views and handover notes by day 14. 1. Should this live as a web app, inside Power Platform, or as an Excel add-in? 2. Will revised AOPs be uploaded mid-year, with earlier versions kept for comparison? Can start right away and run your actual AOP file through a test upload so you see the output first.
₹318,750 INR in 14 days
6.5
6.5

Excel and finance expertise make me well suited to automate your Annual Operating Plan reporting module and turn a complex workbook into a reliable management reporting foundation. I work extensively with Excel formulas, formatting, pivot tables, charts and graphs, supported by skills in automation, business analysis, data analysis and finance. Your repeating month-wise blocks, stacked headings, inconsistent SPV names and interleaved subtotals require careful data structuring and validation rather than simple copying. I can create a controlled, readable reporting workbook that uses the Excel template’s SPV Code for consistent matching, highlights unmatched or placeholder records, and presents budget generation, tariff and revenue values clearly for management review. My focus on accurate data entry, Excel analysis and professional presentation aligns with the need for a dependable process that is easier to verify and hand over. Choose me to build a polished and practical Excel-based solution for your renewable energy MIS reporting.
₹250,000 INR in 1 day
6.6
6.6

My renewable energy experience and investment-grade financial modelling background directly match the need to turn Annual Operating Plan data into a reliable management reporting baseline. I have advised clients across renewable energy and biofuels, supporting executive leadership and investment teams with defensible financial analysis, project finance, and decision-ready reporting. My expertise in Excel, data analysis, financial modelling, scenario analysis and executive reporting is well suited to structuring complex month-wise budget data, comparing generation and revenue against plan, and making inconsistencies visible rather than dependent on fragile manual links. I also understand the importance of clear, presentable outputs for senior management and controlled financial information that can withstand scrutiny. I would bring a commercially focused and detail-oriented approach to automating this MIS reporting module and would be pleased to deliver a robust, management-ready solution.
₹250,000 INR in 7 days
3.1
3.1

Hello, I delivered eleven jobs in six weeks. I promise and keep up the quality, speed and accuracy of the work. I will build the Annual Operating Plan module so the budget is uploaded once for the financial year and held in one place. I will read your workbook exactly as it is, with the seven month blocks and repeated headings, so nobody has to change the file. I will match every project and SPV by the SPV Code and list any name or code that does not match, so it can be fixed before the report goes out. Rows with no SPV or a placeholder value will be flagged instead of being dropped. Sub total rows will be marked so no total is counted twice. The monthly figures will show in a clean table that reads on one screen and exports to Excel. Every month total will match your current report. I'm confident this will help your team prepare the monthly review faster and trust every figure in it. I want you to be delighted with our work - Amul
₹256,400 INR in 9 days
2.5
2.5

Your business case has two rules that collide in the AOP workbook. Rows with no SPV value stay in as unallocated, so total capacity still reconciles, while sub total rows in the source must be skipped. Neither kind of row has an SPV to put a code against, and M3 rejects the file if any data row lacks one. A rule built on the code alone either rejects the file, drops the unallocated capacity or counts every sub total twice. So the frozen template gives unallocated rows a reserved code, which keeps M3 strict, and a row counts as a sub total only if its label says so and its figures equal the rows it covers. Any other row without a code is reported, never guessed. Build, on the stack in your business case: SPFx web parts in React, the workbook read by cell position, rows saved to SharePoint Lists. A re-upload saves under a new upload ID and the active budget switches only once every row is in, so a failed upload never leaves half a budget live. ₹250,000 covers this business case as written, M1 to M8 with D2 to D6, and 5 days of build after the template freeze. The actuals sheet and the other formats reuse the same upload and mapping layer, so each gets its own smaller quote when its format arrives. SPFx is newer to me, but I'd build its web parts in React, which I know well. I've also connected SharePoint documents to an enterprise RAG platform. My rating here is 5 out of 5. Can unallocated rows carry a reserved SPV Code in the frozen template? Ronak
₹250,000 INR in 5 days
0.0
0.0

Hi, We are a team with expertise in data-driven web & desktop applications with secured access. We can develop a secured, scalable & future-ready application for your requirements. We would like to discuss some details about this requirement including - 1) Your preferences for web or desktop application 2) Your preferences for any cloud infrastructure provider or on-premise deployment 3) User roles and their expected access to the system & data Let's connect to discuss the details before we start the work. Regards, Sujata
₹500,000 INR in 45 days
0.0
0.0

Hyderabad, India
Member since Oct 28, 2026
₹12500-37500 INR
₹1500-12500 INR
$10-30 USD
₹250000-500000 INR
$10-30 USD
₹12500-37500 INR
₹750-1250 INR / hour
$250-750 AUD
$30-250 CAD
₹12500-37500 INR
$200-600 USD
₹12500-37500 INR
₹1500-12500 INR
₹500000-1000000 INR
$250-750 AUD
₹12500-37500 INR
$250-750 USD
₹75000-150000 INR
₹250000-500000 INR
$250-750 USD
₹1500-12500 INR