Future small pond on my property in 100 or 500 yr flood zone.
Ngân sách $250-750 USD
- Freelancer
- Các công việc
- Kĩ thuật
- Future small pond on my property in 100 or 500 yr flood zone.
I live on 5 acres 1/3 of it is in the 500 yr flood zone. Per the county i will need an environmental impact assessment before I make a pond. I want to make a pond (about 1/8th if that big). They're houses built in the same zone, so it is a technical requirement. Address: 30335 Sherri Lea, Bulverde TX 78263
2 freelancer chào giá trung bình$440 cho công việc này
My name is Álvaro and I am a civil engineer specialized in hydraulics and hydrology. Currently I am dedicated to performing flood studies. I think I can help you with what you need! Write me! I'm looking forward to Thêm
Hi, I am Civil engineer by profession and I have 5+ years of experience in water resource engineering field. I worked on many flood risk assessment projects for UK, US, Australia and middle east regions. I checked st Thêm