Đã Đóng

Power_capacity_reliability_EIC_

Task ( Data files shared in attachment) IN Draft work and Draft report I have summarized data, and it helps you to proceed quickly

Part 1 :distribution reliability assessment without capacity limitations.

This should contain calculating for set of complete load point and system reliability indices,

including EIC using customer sector damage functions. All calculations should be designed in

excel, where calculations are systematically and clearly be done and can be followed using

spread sheet

Hind for evaluation Ecost (EIC) and EENS:

For every outage event, you need to find Ecost (EIC) for each load sector separately. Then, the

summation of EICs of a load due to different outages will give the total EIC for that load.

To find a load EIC due to each outage event, use the individual outage event ‘r’ (the outage

time) to find its corresponding sector outage cost/kW, from the sector line equation that you

establish. Then multiply the cost/kW by that event failure rate and the average load on outage.

Part 2:

capacity limitations. In this part, the planning calculations for

when the loads are increased to; loads on feeder F1 by 8%, on F2 by 80%, on F3 by 15% and

on F4 by 15%. Similarly, the number of load customers on each feeder should also increase

with the same percentage, but to a rounded integer number. Again, evaluate load point and

system reliability indices, as for the next step, you will need them when you will do cost/benefit

analysis.

Now, we assume that at the end of each noted four feeders there is 5MW solar PV with average

output power of 2.454MW, for 1/3 of every day in a year. For reliability improvement, conduct

a cost benefit analysis for few alternative network reinforcement (upgrade) options to enhance

network reliability indices. Do economic appraisal among the choices you made in bringing

the system reliability performance back close to part 1. Based on the findings and analysis, then

discuss and justify your final choice.

Kĩ năng: Kĩ thuật, Excel, Kĩ thuật cơ khí, Kĩ thuật điện, Power Generation

Xem nhiều hơn: excel large data files, amazon data files, net storing data files, free aiml data files, accessing xml data files alfresco, photoshop excel data files, mysql load large data files, merging data files, read txt data files, create data files excel vba, betfair data files, data files, move data files outlook 2007, simply accounting data files 2008 2009, yellow pages data files, locating turbo lister data files, sending data files java, how to get data from shared preference in android, tally data files are stored in

Về Bên Thuê:
( 654 nhận xét ) Bangalore, India

ID dự án: #31944173

4 freelancer chào giá trung bình ₹2713/giờ cho công việc này

mcollinscalz

Hello am Collins and am a Mechanical Engineer. I have assisted various students on this platform especially Mechanical Engineers to write their report. I will deliver the following parts; Part 1 :distribution reliab Thêm

₹3000 INR / giờ
(42 Nhận xét)
5.2
artarchitect463

Hi Sir, I am electrical engineer and i am working in my field since 2013 I read job description and I can do your project. I am interested to hear more about the project. I can even work on urgent basis and complete yo Thêm

₹2300 INR / giờ
(3 Nhận xét)
1.4
pritambiswas9825

Hiiii. I am very good in MS office. I am very fast in typing. I am excellent in MS Excel. I may help you in this project. And i will give my best . Thank you.

₹2250 INR / giờ
(0 Nhận xét)
0.0
kuriakosejimmyjo

I am an Experienced Electrical Power Systems Engineering consultant with a Master of Science degree in Electrical Power Systems Engineering.

₹3300 INR / giờ
(0 Nhận xét)
0.0