
Closed
Posted
I need a combustion engineer to design an incinerator for municipal solid waste. The incinerator should handle up to 50 tons of waste per day. Key requirements: - Design for waste management - Municipal solid waste processing - Capacity: up to 50 tons/day Ideal skills and experience: - Expertise in combustion engineering - Experience with waste incineration systems - Knowledge of environmental regulations - Ability to design for specified capacity
Project ID: 40647301
13 proposals
Remote project
Active 10 hours ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
13 freelancers are bidding on average £13 GBP/hour for this job

Hi, I reviewed your project requirements and I can help you develop a practical, production-ready solution—not just a visually complete CAD model. I’m a mechanical engineer with 13+ years of experience in product design, mechanical systems, CAD development, engineering analysis, and multidisciplinary coordination. Depending on the project, I can support concept development, detailed 3D modelling, assemblies, manufacturing drawings, BOMs, technical calculations, simulations, and fabrication-ready files. My focus is always on clear drawings, realistic detailing, manufacturability, and fast communication throughout the project. I work mainly with SolidWorks, AutoCAD, ANSYS, Revit, Fusion 360, and related engineering tools. You can review similar design and engineering work in my profile. Once I see the available drawings, dimensions, and expected deliverables, I can suggest the most efficient way to proceed. Best regards, Gökay Zaralı
£35 GBP in 40 days
6.5
6.5

I am a Chemical Engineer with 10+ years of professional engineering experience and extensive expertise in process design, combustion systems, waste treatment, and thermal engineering. I can assist you with the complete conceptual and engineering design of a municipal solid waste incinerator with a capacity of up to 50 tons/day. I can develop the process design based on waste characteristics, moisture content, heating value, combustion requirements, residence time, air supply, and ash generation. The scope can include combustion chamber/furnace sizing, primary and secondary combustion zones, air distribution, temperature and residence-time calculations, heat balance, flue-gas estimation, ash handling, and preliminary pollution-control requirements. I can also consider applicable environmental and emissions requirements during the design. I have completed multiple engineering projects for clients in the USA, UK, Canada, Australia, Saudi Arabia, Oman, Morocco, and other countries. My approach is to provide practical, technically sound calculations and documentation that can be used for further detailed engineering and fabrication. I would be happy to review your available waste composition/data and develop the appropriate 50-ton/day incinerator design.
£13 GBP in 40 days
5.0
5.0

Basic calculation: Design capacity = 50,000 kg/day ÷ 24 = 2,083 kg/h ≈ 2.08 ton/h. Thermal input = 2,083 × LHV (MJ/kg). Final sizing cannot be determined without waste LHV, moisture, and composition. Machine operating stages: 1. Waste receiving, preparation, and feeding. 2. Feeding into the grate/furnace. 3. Primary combustion using controlled primary air. 4. Secondary combustion to complete gas burnout. 5. Flue gas to heat recovery or gas-treatment system. 6. Removal/control of dust, HCl, SOx, NOx, dioxins, etc., as required. 7. Treated gas discharge through the stack. 8. Collection and handling of bottom ash and fly ash. Required calculations: Mass & energy balance, LHV, stoichiometric/excess air, primary/secondary air, flue-gas flow, combustion temperature, residence time, furnace volume, heat-release rate, refractory requirements, ash generation, and emission-control sizing. Missing information/questions: * What is the MSW composition, moisture, and ash content? * What are the LHV/HHV values? * Is 50 ton/day average or maximum capacity? * How many operating hours per day? * Is a specific incinerator type required, or should I select the optimum technology? * Is auxiliary fuel required? * Is heat/steam/electricity recovery required? * What country and emission limits apply? * Is the scope conceptual/preliminary or detailed construction-ready design? * Are CAD, PFD, P&ID, calculations, and equipment specifications required?
£13 GBP in 40 days
4.0
4.0

Are you looking for an experienced combustion/process engineer to design a 50-ton/day municipal solid waste incinerator with a focus on reliable combustion, waste throughput, and environmental compliance? I can develop the preliminary engineering package based on your waste characteristics, operating conditions, and applicable regulations. My approach will cover waste-feed capacity, combustion chamber sizing, primary/secondary combustion zones, residence time, temperature profile, combustion-air requirements, flue-gas flow, heat balance, ash handling, and basic emission-control requirements. I can also prepare the process documentation and equipment sizing needed for the next engineering stage. Deliverables: Design basis and engineering assumptions 50 TPD capacity calculations Process flow diagram Combustion and heat-balance calculations Furnace/combustion-chamber sizing Primary/secondary air requirements Flue-gas estimation Ash-handling concept Preliminary equipment schedule Emission-control concept General arrangement/design recommendations Technical report with calculations Please provide the MSW composition/moisture/LHV data, preferred technology (grate, rotary kiln, etc.), site conditions, and applicable local codes/emission limits. If you have an existing PFD or plant layout, I can incorporate those into the design. Best regards.
£10 GBP in 40 days
3.1
3.1

Hi! I can help develop a practical combustion and incinerator design for a 50-ton/day municipal solid waste capacity, with focus on efficient combustion, reliable waste throughput, emissions control, and safe operation. I’ll work from the waste characteristics and operating requirements to establish the combustion system, chamber sizing, air requirements, residence time, heat balance, and appropriate emissions-control considerations. I’ll also ensure the design is structured around the applicable environmental and safety requirements. Message me now to discuss the waste composition, required operating conditions, and project specifications so we can define the right incinerator design approach.
£10 GBP in 40 days
0.0
0.0

We recently helped a client achieve a highly efficient waste incineration system — and judging by your post, it sounds like we could do the same for you. We've worked on waste management projects and would love to bring that experience to your project. From your post, it sounds like you're looking for something clean and professional, specifically around designing an incinerator for municipal solid waste processing with a capacity of up to 50 tons per day. We specialize in combustion engineering and have a proven track record with 75+ 5-star reviews on similar projects. We rank in the top 1% among 75 million users, ensuring that your project will be in expert hands. I would love to help you with your project! The worst that can happen is you walk away with free consultation. Regards, Shannonkb21.
£10 GBP in 7 days
0.0
0.0

Drawing from my 5+ years of experience as a Mechanical & Electrical Engineer, I believe I am the best fit for your municipal waste incineration project. My expertise in hardware product development, mechanical design, and electronic systems coupled with proficiency in combustion engineering uniquely positions me to meet the demands of this task. With my knowledge of waste incineration system and experience in Mechanical designing for large-scale capacities, I can effectively design an incinerator that will accommodate up to 50 tons of waste per day meeting all your requirements. Understanding the sensitive environmental nature of this task, I possess invaluable understanding and appreciation for environmental regulations and will duly incorporate them into the systems I design. Additionally, my familiarity with solid waste processing combined with a robust ability to analyze complex data using simulation tools will guarantee a comprehensive-designed solution that efficiently handles municipal waste management concerns while operating within the regulatory framework.
£13 GBP in 40 days
0.0
0.0

Hello, You need a combustion engineer to develop a municipal solid waste incinerator capable of processing up to 50 tons per day, with the design focused on efficient waste handling and reliable combustion performance. I can develop the combustion and waste-processing design around the required capacity, considering combustion parameters, chamber configuration, heat recovery, emissions, and practical operating requirements. Also a quick question, do you already have the waste composition and moisture/HHV data available for the 50 ton/day design basis?
£10 GBP in 40 days
1.8
1.8

As an experienced Full-Stack software engineer, I bring a diverse set of skills that can be invaluable for designing and implementing your solid waste incinerator. My proficiency in hybrid app development using technologies such as Flutter and React Native showcases my adaptability and capacity to handle complex projects proficiently. In addition, I have extensive knowledge in integrating various APIs such as payment gateway APIs, social networking APIs, and many more – which could prove highly beneficial when dealing with an integrated system like a waste incinerator. Although my background primarily revolves around software engineering, it has instilled in me a problem-solving mindset and a keen eye for detail that are essential qualities in any engineer. Lastly, I understand the significance of adhering to environmental regulations while designing such waste management systems. I am confident that my familiarity with complying with several industry-specific regulations combined with my resourcefulness will ensure your project meets all necessary standards while efficiently processing up to 50 tons of waste daily. Erroneously, a waste incineration project may seem far-fetched from software engineering, but I firmly believe the technical acumen and ability to learn new concepts swiftly that I've honed over the years put me mehr
£13 GBP in 40 days
0.0
0.0

Chemical/Process Engineer specializing in industrial process design. For this 50 t/day MSW incinerator I propose a structured Phase 1 conceptual package: 1) Extended Design Basis — technology screening against your site's specific conditions (location-driven environmental/regulatory summary, waste characterization using typical MSW data if none is provided) and comparative analysis of available technologies (grate, fluidized bed, electric arc, etc.) with a justified selection. 2) Block Flow Diagram + Process Description for the selected technology. 3) Mass & Energy Balance — waste, combustion air, ash and flue gas streams, plus energy balance (fuel/electric consumption depending on technology). Note: this scope is conceptual engineering; I can extend it to full PFD/P&ID (with control logic and instrumentation, ready for detailed engineering to plan civil, electrical, instrumentation and mechanical works) and even fire-protection network design if the project requires it — happy to scope that as a follow-on phase. Before starting: could you share the site location, any existing waste characterization data, and preferred technology constraints (if any)? Estimated effort: approximately 38 hours, delivered over ~2 weeks, working up to 20 hours per week. Also, I can do it faster if you need it (~1 week).
£10 GBP in 38 days
0.0
0.0

Vanderbijlpark, South Africa
Member since Aug 14, 2026
£10-15 GBP / hour
$25-50 USD / hour
€10-50 EUR
₹12500-37500 INR
$30-250 USD
$30-250 USD
$375-750 CAD
$15-25 AUD / hour
£750-1500 GBP
£1500-3000 GBP
$3000-5000 USD
₹100-400 INR / hour
₹600-1500 INR
$250-750 USD
₹1500-12500 INR
$250-750 USD
$30-250 AUD
$30-250 NZD
€750-1500 EUR
$15-25 USD / hour