Đã Đóng

Geomechanics

Embankment dams are often built up by compacting successive layers of earth materials to form water retaining barriers. A typical rockfill embankment dam is shown in Figure 1, which consists of a core made of very low permeable materials (i.e. compacted clays), covering layers made of more permeable materials (i.e. earth fill or rockfill materials) placed on the upstream and downstream sides, and drain filter (spillway). The covering layers help to prevent erosion by wind or rain and protect against catastrophic washouts when the water flows overtop the dam. Embankment dams are vulnerable to overflow of water eroding the dam structure, so each must be provided with a drain filter (spillway) that can release water from the reservoir if the water level becomes too high.

The stability of the embankment dam during the construction stages and operation stages discussed in Section 2 is analysed using SLOPE/W with the Bishop method. Students are required to perform stability analysis (i.e. determining the lowest factor of safety and possible slip surface) for the embankment in the following cases:

3.1 During stage 1 of construction.

3.2 During stage 2 of construction.

3.3 During stage 1 of the normal operation of the embankment.

3.4 During stage 2 of the normal operation of the embankment.

3.5 During stage 3 of the normal operation of the embankment.

Kĩ năng: Địa chất, Kĩ thuật dân dụng, Viết học thuật

Xem nhiều hơn: built css contact form, form for hire a freelancer, form to hire a graphic designer, create an interactive access form to filter a query, using a form to update a table in access, contact form 7 request a quote, how to add clear form button to a pdf, contact form 7 takes a long time to send, form 1040 schedule a 2017, form 1040 schedule a instructions, form 1040 schedule a 2018, where does the customs form go on a package, how to save web form data in a text file with php, auto-populate form fields using a query string, create a form that imports a spreadsheet into your database, add the image universitylogo to the form header as a logo do not switch views, add the image university logo to the form header as a logo, form 1040 schedule a, how to add a clear form button to a pdf, contact form 7 request a quote plugin

Về Bên Thuê:
( 0 nhận xét ) Nairobi, Kenya

ID dự án: #31919090

4 freelancer chào giá trung bình$45 cho công việc này

(38 Nhận xét)
5.8
Shubham9182

Dear client, I can do this embankment solution for you. I am a geo technical engineering with vast experience. Please contact.

$25 USD trong 7 ngày
(0 Nhận xét)
0.0
Shweta1112

Hello, I have read your job post and I am interested in the same. I have a B. Tech and MBA from the very best universities in the country with an acceptance rate of 0.01% of the applicants. I have been doing academic Thêm

$100 USD trong 7 ngày
(0 Nhận xét)
0.0
abdullahabbasi9

I have worked on a lot of projects on many multiple platforms with many multinational companies on these works I have gained experience on many civil related works. I have 4 years of experience. I have worked on etabs, Thêm

$25 USD trong 1 ngày
(0 Nhận xét)
0.0