Đã Đóng

promodel software

It is just a problem on promodel software which is used in simulation.

United Electronics manufactures small custom electronic [url removed, login to view] must be processed through four stations:assembly,soldering,painting and [url removed, login to view] arrive with an exponential interarrival distribution (mean 20 minutes).The process time distribution are:

ASSEMBLY UNIFORM(13.5,1.5)MINUTES

SOLDERING NORMAL (36,10)MINUTES

PAINTING UNIFORM(55,15)MIN

INSPECTION EXPONENTIAL(8)MINUTES

The soldering operation can be performed on three jobs at a [url removed, login to view] can be done four jobs at a [url removed, login to view] and inspection can be done on four jobs at a [url removed, login to view] a simulation model with [url removed, login to view] it for 100 days 8 hours each .Use an array to store process time information .Read this information fro external spread sheed to simulation model.

Kỹ năng: Thiết kế Công nghiệp

Xem thêm: promodel software, united jobs, soldering jobs, jobs electronics, inspection jobs, industrial jobs, industrial design process, electronics design jobs, electronic design jobs, painting jobs, electronic jobs, uniform, soldering, create operation, create uniform model, simulation model, hours simulation, industrial process animation, simulation design, custom uniform, software custom, animation min, animation electronics, jobs animation, simulation process

Về Bên Thuê:
( 0 nhận xét ) United States

Mã Dự Án: #1046005