Đã Đóng

Part Time Mechanical Design Engineer

Experience required

Industrial water, waste water and desalination plants.

Confidence with Root Cause Analysis, FMECA/FMEA, Maintenance Strategies, RCM and/or PMO.

Water and Waste water treatment plants

Pump Stations

Completions:

Assist in the preparation and delivery of commissioning plans as required

Assist in gathering as-constructed information throughout the construction phase (as-built drawings, completed ITPs and ITRs (Inspection and Test Records), test reports, etc.)

Kĩ năng: Kĩ thuật cơ khí, Kĩ thuật, Kĩ thuật vật liệu, Process Engineering

Về khách hàng:
( 51 nhận xét ) TRANMERE, Australia

ID dự án: #34374069