Đang Thực Hiện

156650 Algorithm to calc schedule

The goal of this project is to create a vb.net managed class using Framework 2.0, that would allow us to enter the SQL schedule fields:

- freq_type

- freq_interval

- freq_subday_type

- freq_subday_interval

- freq_relative_interval

- freq_recurrence_factor

- active_start_date

- active_end_date

- active_start_time

- active_end_time

The class should then expose a function that calculates the next run date/time.

Details on the schedule field format can be found at:

[url removed, login to view]

The class should not use external dependencies to determine the next run date/time.

Please, include availablilty and estimated completion in bid.

Kỹ năng: .NET, Bất kì công việc gì, SQL

Xem thêm: vb net algorithm, vb algorithm, use of algorithm, use algorithm, us algorithm, project calc, net algorithm, algorithm vb.net, algorithm is, algorithm function, algorithm com, framework microsoft, schedule project, Project Schedule, Calc, algorithm project 2, aspx schedule, project algorithm, schedule net, net schedule, sql algorithm, sql library, class library project, create algorithm, class library

Về Bên Thuê:
( 11 nhận xét ) Winter Park, United States

Mã Dự Án: #1902835

Đã trao cho:

bitdonkey

hi, here's my bid.

$150 USD trong 1 ngày
(64 Đánh Giá)
5.6