Đã hoàn thành

75425 E-Currency Exchange Order Form

Basically what I need is to have a nice order form which will allow currency exchanges at out current site: https://www.epaydirect.net. I would like it to be able to accept all types of funding,, i.e. PayPal, ePayDirect, Bank Wire, CC, etc. and to be able to buy e-ccurency, E-Gold, INTGold, etc. and vice versa. AAll the payment types are listed at https://www.epaydirect.net. The site needs to be as automated as possible and go to the appropriate checkout site.

Kĩ năng: Bất kì công việc gì, Thiết kế đồ họa, Perl, PHP, Thiết lập Bản thảo, Thiết kế trang web

Xem nhiều hơn: paypal pending order, paypal order pending, currency, net order, perl exchange, funding site, php paypal checkout form, funding site php, order payment form, exchange perl, paypal order, checkout order form, paypal currency, exchange net, payment exchange, bank wire, net payment form, order form payment php, bank net, perl checkout paypal

Về Bên Thuê:
( 17 nhận xét ) Newport News, United States

ID dự án: #1823056

Được trao cho:

                                                    cfedge
                                                's Profile Picture"                                                    >
                                                </a>
                                            </figure>
                                        </div>
                                        <div class=
cfedge

I have done several e-gold/paypal automation scripts. I have coded a full e-currency echange website. I have even coded ecurreny to ecurrency automated transfers. Please PMB me more details for a better quote. I l Thêm

$50 USD trong 1 ngày
(1 Nhận xét)
2.0