Open
Posted
•
Ends in 4 hours
Paid on delivery
The shocker-testing machine on my line already has a full SCADA package in place, yet it keeps dropping communication with its PLC, attached sensors, and actuators. The HMI screens load fine, but tags freeze, commands fail to reach the field devices, and alarms flood the log. I need the existing project inspected, its driver or protocol stack corrected, and the link restored to rock-solid reliability—no redevelopment from scratch, just a clean, well-documented fix. Scope of work • Audit the current SCADA project, driver settings, and network configuration. • Pinpoint the root cause of the PLC, sensor, and actuator comms failures. • Implement and test the corrective actions so data reads accurately and control writes execute every cycle. • Supply a brief technical report summarizing findings, changes, and proof-of-run. Acceptance criteria A continuous eight-hour production run with zero lost packets, frozen tags, or mismatched data will signal success. You’ll receive the project files, PLC tag list, and VPN access as soon as we agree.
Project ID: 40681096
14 proposals
Open for bidding
Remote project
Active 1 day ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
14 freelancers are bidding on average ₹7,932 INR for this job

Hi, I have experience in designing Circuits and can complete your project. I have expertise in the following: 1- Designing schematic and PCBA 2- Ordering the PCBA and getting boards manufactured. 3- Writing firmware for the PCBA to make sure everything works as expected. 4- I can also develop smartphone apps to communicate and control the hardware. If you wish we can discuss in chat. Thank you.
₹7,000 INR in 7 days
7.4
7.4

As a seasoned electrical engineer with a broad range of experience in industrial automation, I am confident that I can successfully tackle your SCADA communication issue. I've worked extensively on projects similar to yours, including Wastewater and Water Treatment Plant Automation, which involved writing system software with Siemens TIA Portal, utilizing Simatic Manager for control purposes, and monitoring systems using Siemens WinCC SCADA. Additionally, I have completed projects in which I configured drivers and protocols - such as ABB & Siemens - to ensure efficient machine communication. These skills, combined with my proficiency in debugging complex systems and drawing from my exposure in the iron steel and energy sectors, will enable me to promptly identify the root cause of your SCADA problem and make necessary adjustments to restore rock-solid reliability. Utilizing my expertise with PLC & SCADA systems like those used in your establishment, I have performed comprehensive point-to-point tests during commissioning to guarantee the operational efficiency of each machine component. This meticulous approach is what you need now; not rebuilding from scratch but rather a clean fix that addresses every intricate detail in your existing project.
₹12,000 INR in 7 days
5.5
5.5

I would be glad to troubleshoot and stabilize the existing SCADA communication on your shocker-testing machine. I understand that the HMI is functioning while PLC tags freeze, field-device commands fail, and communication alarms occur, so I will focus on identifying and correcting the actual root cause rather than rebuilding the system. I can audit the existing SCADA project, PLC drivers/protocol configuration, tag mapping, communication parameters, network topology, and sensor/actuator interfaces. I will systematically trace the communication path, identify issues such as driver configuration, addressing, timeouts, polling conflicts, network instability, or protocol mismatches, and implement the required corrective actions. After the fix, I will verify accurate read/write operations, alarm behavior, and communication stability under realistic production conditions. I will also provide a concise technical report documenting the findings, changes made, test results, and proof-of-run. I am comfortable working with existing PLC/SCADA systems and VPN-based remote access. Give me one opportunity to handle your project, and I will deliver a reliable, well-documented solution focused on achieving your eight-hour zero-failure acceptance criterion.
₹6,000 INR in 2 days
0.6
0.6

Hi there, I totally get the frustration of communication issues in a SCADA system. I've worked on similar projects where I fine-tuned drivers and protocols to restore seamless communication, ensuring everything runs smoothly. You can count on my experience to meet your expectations. I see you need a clean, professional fix without starting from scratch. It sounds like we’ll need to audit the current SCADA project and address those pesky communication failures with the PLC, sensors, and actuators. I’m all for getting that link back to rock-solid reliability. I specialize in troubleshooting and optimizing SCADA systems, and I thrive on solving complex issues. You’ll appreciate my commitment to speedy communication and a fast turnaround. Let me know if you are available for a quick chat! Regards, Wonita
₹3,900 INR in 7 days
0.0
0.0

This project immediately caught my attention because it is exactly the type of work I do best. I understand the importance of restoring reliable communication between your SCADA system, PLC, and attached devices. The need for a clean, well-documented fix without redevelopment aligns perfectly with my approach. I specialize in troubleshooting SCADA systems and have extensive experience with driver settings and network configurations. While I am new to freelancer, I have tons of experience and have done other projects off site. If this sounds like what you're looking for I'd love to hear more about your project. Regards, Warrick Van Eeden
₹5,650 INR in 7 days
0.0
0.0

I've spent 20+ years in industrial control and embedded comms, including SCADA-to-PLC links over the common driver and protocol stacks, so tracking down why tags freeze and commands stop reaching field devices is squarely my kind of work. The HMI loading fine while tags freeze and commands fail points at the driver, protocol or network layer, not the SCADA app itself, so the win is finding the real fault, not rebuilding anything. What I'd do: - Audit the existing SCADA project, driver settings and network configuration. - Pinpoint the root cause of the dropped PLC, sensor and actuator comms: protocol timeouts, addressing, polling or network. - Correct the driver or protocol stack and restore a rock-solid link, with the alarm floods gone. - Document the fault and the fix so it does not come back. You get the existing SCADA link restored to reliable operation, root cause found and documented, with no redevelopment. One thing to confirm: which SCADA package and PLC are these, what protocol (Modbus, OPC UA, Profinet or other), and can you give me remote access to the engineering station to start the audit? I can start right away.
₹6,000 INR in 7 days
0.0
0.0

I have hands-on experience with PLC and SCADA systems from my time as a Junior Technician at Hatch Ltd., where I developed and modified PLC control logic, built and supported HMI/SCADA interfaces, and worked directly with Modbus and industrial communication protocols for system integration and troubleshooting. For your shocker-testing machine, the symptoms you describe — tags freezing, commands not reaching field devices, alarms flooding the log while the HMI itself loads fine — point to a comms-layer issue rather than the SCADA application logic itself. My approach: Audit the driver configuration, polling rates, and timeout/retry settings between the SCADA package and the PLC. Check network config — IP conflicts, switch/port issues, cable or termination faults (especially if Profibus/Modbus RTU is involved), and traffic congestion that could cause dropped packets. Inspect PLC-side comm module status and error codes, and verify sensor/actuator wiring and I/O mapping against the tag list. Implement fixes, then run a soak test to confirm stability before signing off. Deliver a concise technical report: root cause, changes made, and proof-of-run data. I'll treat this as a targeted fix, not a redevelopment — working within your existing project. Happy to start as soon as I get the project files, tag list, and VPN access.
₹7,000 INR in 4 days
0.0
0.0

Hello, I have experience in PLC programming, HMI/SCADA systems, and troubleshooting different types of industrial communication networks and protocols, including Modbus TCP, Modbus RTU, and other Ethernet- and serial-based communication systems. I can review the existing SCADA project, PLC configuration, tag addressing, communication driver, and network parameters to identify the cause of connection losses, frozen values, and control commands failing to reach the field devices. I will begin with a structured diagnosis and, once the root cause has been identified, implement the necessary corrective actions. I will also verify the stability of data readings and control commands during the eight-hour production test. Upon completion, I will provide a technical report summarizing the findings, modifications performed, test results, and recommendations. Before starting, I would appreciate confirmation of the PLC brand and model, the SCADA software and version, and the communication protocol currently being used.
₹5,500 INR in 6 days
0.0
0.0

I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience I will help you. Now worries. I have best expirience
₹10,000 INR in 7 days
0.0
0.0

I’m an Industrial Automation Engineer with practical experience in PLC, SCADA/HMI, industrial communication, and troubleshooting, and I’m interested in helping diagnose and restore the communication reliability of your existing Shocker-testing machine. I understand that the SCADA system and HMI are already implemented, but the communication with the PLC, sensors, and actuators is unstable, causing frozen tags, failed commands, and excessive alarms. My approach would be to troubleshoot the existing system rather than redesign it from scratch. I can review the existing SCADA project, PLC configuration, network settings, tag mapping, and available diagnostics to identify the root cause. After that, I can implement and test the required corrective actions to ensure reliable data reading and control commands. My experience includes Siemens S7-1200 and S7-300 PLCs, WinCC-based SCADA/HMI systems, PLC troubleshooting, sequencing, alarms and interlocks, as well as industrial communication using PROFINET, PROFIBUS, and Modbus. One relevant project was a Color Mixing System using two Siemens S7-1200 PLCs, SCADA monitoring and control, PROFINET communication, and Modbus communication with an Altivar VFD. I also worked on an Automated Sorting and Storage System using two S7-300 PLCs with PROFIBUS communication, SCADA, and HMI. I’d be happy to review the SCADA project, PLC tag list, and communication setup to determine the best troubleshooting approach. Best regards, Mohamed
₹8,000 INR in 3 days
0.0
0.0

Hi, I can take this troubleshooting job. Since the HMI itself stays running while tags freeze and commands stop reaching the PLC/field devices, I would first trace the communication path rather than modify the SCADA application blindly. I’ll check the driver/protocol settings, PLC connection, polling and timeout behavior, network errors and tag quality to isolate exactly where communication is dropping. Once the cause is confirmed, I can apply the fix without rebuilding your existing project, then monitor reads/writes during the 8-hour production run and document what was changed. Please send me the SCADA platform/version and PLC model first. I can start with the project files and VPN access.
₹7,000 INR in 2 days
0.0
0.0

I am troubleshooter for a reason in my company, I have work on SCADA of Siemens , Aveva, Rockwell and also web SCADA
₹7,000 INR in 5 days
0.0
0.0

Bhilai, India
Payment method verified
Member since Nov 4, 2018
₹12500-37500 INR
₹1500-12500 INR
₹37500-75000 INR
₹1000000-2500000 INR
₹37500-75000 INR
$15-25 USD / hour
$30-250 USD
$30-250 USD
$3000-5000 USD
$30-250 USD
₹100-400 INR / hour
€30-250 EUR
$750-1500 USD
$1000-2000 USD
£10-15 GBP / hour
₹3500-4000 INR / hour
€6-12 EUR / hour
$1500-3000 USD
$250-750 USD
₹1500-12500 INR
$250-750 USD
₹1500-12500 INR
₹1500-12500 INR
$110-250 USD
$250-750 USD