Đã Đóng

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

9 freelancer chào giá trung bình$167 cho công việc này

hany74

Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as M Thêm

$140 AUD trong 3 ngày
(41 Nhận xét)
5.5
(14 Nhận xét)
4.9
engrrockyalam

hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, Thêm

$50 AUD trong 3 ngày
(33 Nhận xét)
4.4
engselgendy

How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manage Thêm

$140 AUD trong 4 ngày
(18 Nhận xét)
4.0
(1 Nhận xét)
2.3
raza61

Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my Thêm

$190 AUD trong 7 ngày
(0 Nhận xét)
0.0
pkoutsis22

Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me direc Thêm

$140 AUD trong 4 ngày
(0 Nhận xét)
0.0
(0 Nhận xét)
0.0
harikamadduri

Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to op Thêm

$175 AUD trong 5 ngày
(0 Nhận xét)
0.0