
Đang triển khai
Đã đăng vào
Thanh toán khi bàn giao
I require a concise Bill of Quantities that covers the groundwork, formwork and concrete work for a handful of footings and their associated excavation. All measurement must follow the ANZSS rules and the take-off has to be completed directly in CostX. Scope The drawings are ready and the package is small, limited to excavation, footing concrete, reinforcement, formwork and any incidental items that ANZSS requires to be shown. No other trades are involved. If you are comfortable working in CostX under ANZSS and can meet the two-day window, this should be a straightforward assignment.
Mã dự án: 40358810
2 đề xuất
Dự án từ xa
Hoạt động 12 ngày trước
Thiết lập ngân sách và thời gian
Nhận thanh toán cho công việc
Phác thảo đề xuất của bạn
Miễn phí đăng ký và cháo giá cho công việc

Dear Sir, I am a Senior Quantity Surveyor with 25+ years of experience in BOQ preparation and cost estimation. I can provide accurate quantities using Excel/Bluebeam as per ANZSMM standards, including excavation, concrete, reinforcement, and formwork. I ensure clear documentation and timely delivery. I am ready to start immediately.
₹7.500 INR trong 2 ngày
0,0
0,0
2 freelancer chào giá trung bình ₹4.500 INR cho công việc này

Hello, I’d be a strong fit for this assignment—preparing **accurate BOQs using CostX in line with ANZSS measurement rules** is exactly the kind of work I handle. I understand that precision and compliance are critical here, especially for a **focused scope involving excavation, footings, concrete, reinforcement, and formwork**, with no scope creep into other trades. --- **What I will deliver:** • A concise, fully measured **Bill of Quantities prepared in CostX** • All quantities aligned strictly with **ANZSS rules of measurement** • Clear breakdown of: * Excavation (including allowances where required) * Concrete (footings) * Reinforcement * Formwork * Any incidental items per ANZSS standards • Clean, structured output ready for pricing --- **My approach:** * Review drawings carefully and set up CostX workbook * Perform detailed take-off with correct classification * Ensure compliance with ANZSS measurement guidelines * Cross-check quantities to eliminate discrepancies * Keep BOQ concise but complete (no overcomplication) --- **Why I’m a strong fit:** • Experience with **CostX take-offs and BOQ preparation** • Familiarity with **ANZSS measurement standards** • Strong attention to detail (critical for quantity accuracy) • Ability to deliver within tight timelines --- **Timeline:** I can complete the full take-off and BOQ within your **2-day window**, ensuring accuracy and compliance. ---
₹1.500 INR trong 7 ngày
0,0
0,0

Mumbai, India
Thành viên từ thg 4 9, 2026
₹600-1500 INR
₹750-1250 INR/ giờ
€30-250 EUR
$30-250 USD
£10-20 GBP
$250-750 USD
$10-11 USD
$55-60 USD/ giờ
$30-250 USD
£250-750 GBP
$250-750 USD
$5000-10000 USD
$30-250 USD
$250-750 USD
$10-30 USD
tối thiểu 50 AUD$/ giờ
$250-750 USD
$10-30 USD/ giờ
₹3500-4000 INR
$10-30 USD
₹1500-12500 INR