Đã Hủy

WBS for project

1-Effort P-m

2-Number of peple

3-Cost in money

4-Duration Using:

a-LOC

b-Functiontion point

c- Cocomo model

You can determine which programming language is appropriate to calculate the number of lines of code and the assumption of auxiliary data for the account...

Kỹ năng: Quản lí dự án, Kiến trúc phần mềm, Phát triển phần mềm

Xem thêm: work breakdown structure template word, wbs project management examples, work breakdown structure construction, work breakdown structure for building a house, work breakdown structure template excel, work breakdown structure software, how to create a work breakdown structure, work breakdown structure pdf, data mining apriori code

Về Bên Thuê:
( 34 nhận xét ) Medina, Saudi Arabia

Mã Dự Án: #14871611

2 freelancer đang chào giá trung bình $63 cho công việc này

hany74

Hello, I'm a mechanical engineer with project management background, utilizing Primavera P3, P6 and MS Project. Relevant Skills and Experience I have more than ten years of experience in planning and scheduling proje Thêm

$61 USD trong 10 ngày
(33 Đánh Giá)
4.7
$65 USD trong 7 ngày
(0 Đánh Giá)
0.0