Ảnh đại diện của faizankhalid89
@faizankhalid89
Cờ của Pakistan City In Pakistan, Pakistan
Làm thành viên từ Ngày 29 tháng 12 năm 2013
0 Đề xuất

faizankhalid89

Trực tuyến Ngoại tuyến
اقْرَأْ بِاسْمِ رَبِّكَ الَّذِي خَلَقَ - 96:1 READ IN THE NAME OF THY LORD WHO CREATES Alhamdu Lillah (Thanks to ALLAH SWT) I have BSc in Electrical Engineering from University of Engineering & Technology, UET Lahore, Pakistan. 132.50$/hr (OR 65$/hr - 200$/hr range) is for Americans only (Whether perhaps engineers or not, opinion) and other regions 65$/hr to 200$/hr with their exchange rate (weighted rate) until and unless I am in Pakistan Government (then I might have to take NOC-No Objection Certificate- for doing this), for Pakistanis/Muslims it is about 2$/hr (and/or about 3$/hr, perhaps).......................................You need to send/submit your Computerized National Identity Card (CNIC) or National Identity Card to me. [If] You trust me, I will trust you. ●Electrical Engineering ●Research in Development ●Energy Generation Systems ●Energy Storage Systems ●Industrial ●Electronics Engineering, Product Design, Designing with Details ●Software Development, Design,
$133 USD/giờ
8 đánh giá
2.7
  • 80%Các công việc hoàn thành
  • 85%Đúng ngân sách
  • 100%Đúng giờ
  • 8%Tỉ lệ thuê lại

Portfolio

Các đánh giá gần đây

Kinh nghiệm

IEEE Lahore Section Ambassador at IEEE Day

Aug 2016 - Jun 2017 (10 months)

1. Was in the Coordinated event at The Islamia University of Bahawalpur on the theme of "Leveraging Technology for a Better Tomorrow". 2. Lahore Usman Munawwar also phoned me about my "email routing", He doesn't know, the transformer, that emails are to be routed.

Chief Executive Office (CEO)

Feb 2016

52% Profit share to you by selling our Products at 1. License to Copy of Design of Bomber Aircraft™®: You can also apply to vacant Positions at

Electrical Engineer

Sep 2014 - Nov 2014 (2 months)

Research & Development (R&D).

Electrical Engineer

Mar 2014 - Dec 2016 (2 years)

.

(Intern) Engineer

Apr 2013 - Jun 2013 (2 months)

1. Was told about first day that you have find work on another place you will not be employed after 3 months. It was suggested that we better find work on the then-under-construction Quaid-i-Azam Solar Park, Bahawalpur, Pakistan Construction Site on some 11KV (or whatever KV) Power lines. 2. Was told by Fellow students that Nawaz Sharif and/or Shehbaz Sharif (Two Brothers) doesn\'t even care that they have placed us, Electrical Engineers, or perhaps at least merit-wise better than Civil Eng...

Engineer

Apr 2013 - Jun 2013 (2 months)

Day to Day work

(Intern) Engineer

Mar 2012 - Apr 2012 (1 month)

Different Machinery 1. Snaforizing, 2. Bleaching 3. Dyeing 4. Rolling 5. Quality Control 6. PLC & SCADA 7. German Computers 8. Power Generation 9. Windings of Motors/Generators 9. Electronics: PCBs Lenze PCBs, SIEMENS PCBs 10. Computers & Software

Giáo dục

Electrical Engineering

2006 - 2010 (4 years)

Qualifications

ABCs of EVs (2014)

IEEE

Different enabling technologies discussion, real work scenarios of getting this to work.

Circuit and System Insights (2015)

IEEE

Circuit design analysis etc.

Clutter Rejection Techniques: Basic and Moving Target Indication (MTI) (2015)

IEEE

2015

Clutter Rejection Techniques-Pulse Doppler Processing (2015)

IEEE

Clutter Rejection methods.

Innovation and Entrepreneurship within the Tech Community in Nairobi (2015)

IEEE

Innovation..

Introduction to EPICS in IEEE (2015)

IEEE

Introductory

IPR Copyright Tutoril (2015)

IEEE

Intellectual Property Rights

IPR Patents Tutorial (2015)

IEEE

Intellectual Property Rights

IPR Plagiarism Tutorial (2015)

IEEE

Tutorial

IPR Trademarks Tutorial (2015)

IEEE

Tutorial

Leveraging ICT Business Models to Help Reduce Poverty (2015)

IEEE

ICT Utilization for Poverty reduction

Local Infrastructure Service Delivery in Developing Countris (2015)

IEEE

.

Reduce your outages and gain control! Don't let applications issues impact your clients (2015)

IEEE

Application building rules

Thinking Across the Plug: The Coming Integration of Electric Vehicles and Smart Grids (2014)

IEEE

Electric Vehicles in the market that are currently affording.

CCNA+WiMAX (2009)

Corvit

CCNA Preparation & WiMAX as enabling technology

CCNP-BCMSN (2009)

Corvit

It was building Multi-layered switched networks with technologies

Các xuất bản

femtsoft.com

Products, Memberships, Articles,

hardsofts.com

Articles...

Chứng Nhận

  • US English Level 1
    90%
  • US English Level 2
    85%
  • US English Level 3
    75%

Các Chứng Nhận

  • Đã kết nối với Facebook
  • Freelancer Ưa Thích
  • Đã Xác Thực Thanh Toán
  • Đã Xác Thực Điện Thoại
  • Đã Xác Thực Danh Tính
  • Đã Xác Thực Email

Xem các Freelancer tương tự