COGENERATION POWER PROJECT
Fully involved in Erection, commissioning & Maintenance activities of Pakarab Fertilizers New Cogeneration Power Plant including 3 x 11.25 MW Gas Turbine (Model: GE-10-1) of M/s GENP-Italy. GE -Fanuc RX3i-PLC system HIMA F35 ESD System GE MARK VI PAC system Woodward Fuel Governing System Bentley Nevada BN 1701 Vibration Monitoring system 3 x 50 Ton/hr. HRSG (Boilers) of M/s Umag, Germany. Vendor Drawings/documents review and approval COGEN BOP Instruments specs. finalization and Ordering MV/LV SIVACON Switchgear installation of Siemens S7-412,S7-414,S7-417 Siemens PLCs commissioning DCS (PCS-7) of Siemens Fiber Optic link commissioning Between HRSGs and GTGs Emergency Load management System (ELMS) PSSR/PHA/HAZOP/FMEA assessments and implementation
About Me
I am graduate in Electronic Engineering and had 7 years of Experience at Fertilizer industry. This includes Maintenance of Instruments and Control system, DCS, VMS, ESD, F&G installed at Power & Steam generation Units, Nitric Acid/ CDM Plants. The Project Experience includes Erection, Commissioning and maintenance of Cogeneration (3 Gas Turbines with HRSGs) and implementation of Oracle eAM R12 CMMS bases system from instrumentation side. Currently, I am giving after implementation support for CMMS Based Oracle EAM- Enterprise Asset Management system at PFL Complex Level.
$ 3 USD/hr
NEW FREELANCER!