Modelling simulation using tecnomatix plant simulation 15
$30-250 USD
Thanh toán khi bàn giao
Sewing tool packaging production line. Every week will send products include the stuff require to pack the sewing tools. So, I need to build a model simulation that will determine how many days products will ready to ship back the factory.
ID dự án: #30620675
Về dự án
1 freelancer đang chào giá trung bình $200 cho công việc này
Hi, please let me know the aspects of this project, the requirements, and if you have any documentation on what should be done. Thanks